Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 27, 2024 at 7:00 PM
Updated February 28, 2024
Site work and addition to a municipal facility in Middletown, Delaware. Completed plans call for the addition of a municipal facility; and for site work for a municipal facility.
Pre-bid Meeting: Yes Refer to; PRE-BID MEETING in PROSPECTIVE BIDDERS NOTES. Location: New Castle County These improvements are more specifically shown on the Location Map(s) of the attached Plans. The improvements consist of furnishing all labor and materials for the expansion of DTCs MidCounty Operations Center by adding four bays to the existing maintenance facility. The current maintenance facility is operating at capacity, and expansion is needed to continue to provide transit patrons with exceptional service in the growing region of southern New Castle County. The expansion has also been designed to support maintenance for DTCs future fleet of hydrogen fuel cell electric buses. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. All work on this contract must be complete within 315 Calendar Days. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. It is estimated a Notice to Proceed is issued such that work starts on or about June 3, 2024. Questions : E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. The date of the final posted Questions and Answers document must be entered on the submitted Certification Form. Question Deadline 02/12/2024 at 2:00 PM ET Set Aside(s) MBE (12%), WBE (7%), DBE (5%) Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based Rating System - 29 Del.c. 6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. Refer to 'general Notices' for Details. DEDOT - Mid County Maintenance Facility Expansion Re-Advertisement 20.526
Post-Bid
Municipal
$6,761,998.00
Public - State/Provincial
Addition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2024
June 3, 2024
Multiple Locations, Middletown, DE
Related To This Project
Middletown, DE
Bid Date: Jan 24 2023
Middletown, DE
--
Middletown, DE
--
Middletown, DE
Bid Date: Jul 19 2022
Middletown, DE
--
Middletown, DE
--
Middletown, DE
--
Middletown, DE
Bid Date: Jul 26 2022
Middletown, DE
--
Middletown, DE
Bid Date: Nov 30 2021
Middletown, DE
--
Middletown, DE
Bid Date: Jul 13 2022
Middletown, DE
--
Middletown, DE
--
Middletown, DE
--
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
