BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Dubuque, Iowa. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project provides city funds to leverage Iowa Department of Natural Resources and/or Iowa Department of Transportation state and federal pass-through grants for trails and complete streets projects as the City implements capital projects identified as high priorities in the Connecting Downtown Destinations Study, Tri-State Trail Plan and City's Complete Streets Policy. The focus is on the two remaining phases of the Schmitt Island, Historic Millwork District (HMD) Trail connection to the Bee Branch Greenway. These segments will complete off-road, multi-use bike/hike trail that would circle the 16th Street Detention Basin plus link the lower greenway/basin trail to the HMD and Schmitt Island. Phase 2 focuses on creating the off-street trail segment between 12th Street and the existing north side basin trail and will reduce southbound Kerper Boulevard via a road diet. The FY 27 funds create a new trail connection beginning where Phase 1 ends at 12th Street and then heads south towards 11th Street to a point where a safe transition can be made at 11th Street. The trail would then extend past the Jule Operations & Training Center, head west across railroad tracks, near 9th Street, and connect to Elm Street adjacent to the Intermodal Transportation Center. Competitive grant applications will be sought for all phases, and all existing trail grants require a local match. This project is included in the city’s fy 2025-2029 Capital Improvement Program. As of July 15, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$675,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
29
Bidding Soon
610
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

img_map_placeholder

Multiple Locations, Dubuque, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.