Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Emery, Utah. Contact the soliciting agency for additional information.
This Request for Statement of Qualifications ("RFSQ") is issued in accordance with State of Utah Procurement Code, Utah Code Annotated (UCA) Chapter 63G-6a, and applicable Rules found in the Utah Administrative Code (UAC). If any provision of this RFSQ conflicts with the UCA or UAC, the UCA or UAC will take precedence. The State of Utah, Division of Purchasing has issued this RFSQ to obtain statements of qualifications from companies interested in providing services for a site investigation, subsequent report, and engineering design for repairs to the underground sandstone and concrete culvert at the historic Mohrland Mine in Emery County Utah. It is anticipated that this RFSQ/SOIQ will result in a single contract award to the responsive and responsible offeror who is the most qualified. Evaluations will be conducted according to the State of Utah Procurement Code 63G-6a-1503.5 and awarded according to 63G-6a-1505: 63G-6a-1503.5 Evaluation of statements of qualifications. Consultant to provide this service. (1) An evaluation committee appointed under Section 63G-6a-1503 shall evaluate and score each responsive statement of qualifications that has not been eliminated from consideration under this chapter, using the criteria described in the request for statement of qualifications. (2) Criteria not described in the request for statement of qualifications may not be used to evaluate a statement of qualifications. (3) An evaluation committee may enter into discussions or conduct interviews with, or attend presentations by, the design professionals whose statements of qualifications are under consideration. (4) An evaluation committee shall rank the top three highest scoring design professionals, in order of their scores, for the purpose of entering into fee negotiations as provided in (5) If fewer than three responsible design professionals submit statements of qualifications that are determined to be responsive, the procurement official shall issue a written determination explaining why it is in the best interest of the procurement unit to continue the fee negotiation and the contracting process with less than three design professionals. (6) (a) The deliberations of an evaluation committee may be held in private. (b) If the evaluation committee is a public body, as defined in Section 52-4-103, the evaluation committee shall comply with Section 52-4-205 in closing a meeting for its deliberations. 63G-6a-1505. Determination of compensation for design professional services. (1) The procurement officer shall award a contract to the qualified design professional whose statement of qualifications was awarded the highest score under Subsection 63G-6a-1503(4) by the evaluation committee, at compensation that the procurement officer determines, in writing, to be fair and reasonable to the procurement unit. (2) In making the determination described in Subsection (1), the procurement officer shall take into account: (a) the estimated value, scope, and professional nature of the services; and (b) the complexity of the project or services. (3) If the procurement officer is unable to agree to a satisfactory contract with the highest scoring design professional, at a price the procurement officer determines to be fair and reasonable to the procurement unit, the procurement officer shall: (a) formally terminate discussions with that design professional; and (b) undertake discussions with the second highest scoring, qualified design professional. (4) If the procurement officer is unable to agree to a satisfactory contract with the second highest scoring design professional, at a price the procurement officer determines to be fair and reasonable to the procurement unit, the procurement officer shall: (a) formally terminate discussions with that design professional; and (b) undertake discussions with the third highest scoring, qualified design professional. (5) If the procurement officer is unable to award a contract at a fair and reasonable price to any of the highest scoring design professionals, the procurement officer shall: (a) select additional design professionals; and (b) continue discussions in accordance with this part until an agreement is reached. The estimated contract period is for 15 months to October 1, 2023. The method of contractor selection has not been determined at this time.
Conceptual
Bridges / Tunnels
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2023
To Be Determined, Emery, UT
Related To This Project
Emery, UT
Bid Date: Oct 04 2022
Emery, UT
Bid Date: Mar 15 2022
Ogden, UT
Bid Date: Jun 16 2022
Provo, UT
Bid Date: May 17 2022
Orem, UT
Bid Date: Jun 14 2022
Spanish Fork, UT
Bid Date: Mar 31 2022
Farmington, UT
Bid Date: Jun 02 2022
Blanding, UT
Bid Date: Jun 02 2022
St George, UT
Bid Date: May 19 2022
Cedar City, UT
Bid Date: Jun 01 2022
Riverdale, UT
Bid Date: Jun 14 2022
Spanish Fork, UT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.