Site work and paving for a mixed-use development in Halfmoon, New York. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project work sites are located on Button Road and Lower Newtown Road in the Town of Halfmoon, New York. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including but not necessarily limited to the following: -- Construction of a 1,000,000-gallon elevated water storage tank and associated appurtenances including miscellaneous site work, grading, concrete foundation, foundation piles, tank erection, tank coating and disinfection, piping, altitude valve vault, fencing, paved access road and parking area, and erosion and sediment control measures. -- Open-cut installation of approximately 670 linear feet of 10-inch high density polyethylene water main to connect the proposed water storage tank to the existing water distribution system, including all associated piping, fittings, hydrants, valves, and the hydrostatic testing and disinfection of the water main. Each bid must be accompanied by a bid security in the amount of not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the Information to Bidders. The successful bidder will be required to furnish to the Town of Halfmoon an executed performance and completion bond in a form meeting the Town's approval, in an amount not less than 100% of the accepted bid as security for the faithful performance and completion of this contract, and also a separate bond guaranteeing prompt payment of monies due to all persons supplying the contractors or subcontractors with labor and materials employed and used in carrying out the contract, and having as surety on the bonds such surety companies as are approved or acceptable to the Town of Halfmoon. The Town of Halfmoon reserves the right to reject any or all bids. All work shall be subject to equal opportunity in employment, State wage rates and all other requirements in accordance with applicable law.

Award

Water / Sewer

$1,500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
79
Bidding Soon
1,183
All Active Projects
564
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.