Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to an educational facility in Fayetteville, Arkansas. Working plans call for the addition of a 21,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Per the owner, as of October 3, 2022, design teams and a general contractor have been selected. Design is anticipated to begin in October of 2022. A timeline for construction has not been determined. Closed solicitation has been included below for reference. ........... Bogle Park was built in 2008 as the new home of Razorback Softball. Its construction was made possible by a gift of Bob and Marilyn Bogle, and was officially named in their honor in October 2009. The park is nestled into the hillside leading from Mullins Creek up to Stadium Drive, and has an entrance concourse that creates a striking view of the field as one enters the stadium. The seating bowl provides space for around 1200 fans in chairback seats, and a large grass outfield area stretching along the hillside provides more space for informal viewing. The team areas under the concourse include locker rooms and a small training room. A separate indoor practice building is currently configured for batting and pitching. This project will transform the indoor practice building by adding around 21,000sf of space. An initial programming study 1 envisions better amenities for the home team, including a larger locker room, team lounge, clubhouse, and training room. Other new spaces include coaches' offices, equipment storage and back-of-house spaces, as well as larger public restrooms. The remainder of the park will be lightly renovated to refresh public areas such as ticketing and concessions, along with the upper-level suites. The park sits within a tightly-constrained site, and the proposed addition must fit within the boundary of the west walk, which doubles as a fire lane. The selected team will be challenged to create additional space in a way that retains and enhances the visual importance of the public entrance and concourse. The total project cost is currently estimated at $10-15 million. Architects and consultants will work with a university building committee, an independent third-party commissioning agent, and Facilities Management to advance campus master planning and design principles, as well as sustainability requirements. Printed responses should be no larger than 8.5in x 11in, limited to 50 sheets maximum (100 pages), fully recyclable (i.e. no plastic covers, plastic tabs, etc.) and bound with glue, staples, or thread (i.e. perfect bound, saddle stitching, etc.). No metal or plastic coils allowed. Responses that do not meet these requirements will be disqualified. Please send a digital copy of the response via email to toddf@uark.edu in addition to the printed booklets. To avoid potential conflicts of interest, respondents should not communicate with university staff or faculty about this project. This document provides the relevant information for assembling a Statement of Qualifications. If you have urgent questions, you can send them via email to toddf@uark.edu. The method of Contractor Selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Pre-Construction/Negotiated
Educational
$15,000,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2023
S Stadium Drive, Fayetteville, AR
Related To This Project
Fayetteville, AR
Bid Date: Aug 02 2023
Fayetteville, AR
Bid Date: Oct 04 2022
Fayetteville, AR
--
Fayetteville, AR
--
Fayetteville, AR
Bid Date: Feb 09 2023
Fayetteville, AR
Bid Date: Jan 31 2023
Fayetteville, AR
Bid Date: Nov 16 2021
Fayetteville, AR
Bid Date: Jan 31 2023
Fayetteville, AR
Bid Date: Sep 04 2019
Fayetteville, AR
Bid Date: Apr 05 2022
Fayetteville, AR
Bid Date: Sep 21 2022
Fayetteville, AR
Bid Date: Aug 18 2022
Fayetteville, AR
Bid Date: Mar 30 2023
Fayetteville, AR
Bid Date: Sep 22 2022
Fayetteville, AR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.