BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, remodeling and addition to a mixed-use development in Amity, Oregon. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the remodel of a educational facility; and for site work for a educational facility.

As of December 7, 2023, a design team/general contractor have been identified. Per owner, construction began December 1, 2023 and will be completed August 2025. *The previous closed solicitation is listed below for reference. The Amity School District Is Seeking to Select Architects to Provide the Services Described Herein Design Services for the Following Schools: o Amity High School o Amity Elementary School Project Descriptions: the Primary Scope of Work Is an Addition and Remodel at the Existing Amity High School to Relocate the Existing Amity Middle School and Possibly Abandon the Current Middle School Site. The Scope of Work Will Add Student Capacity for Amity School District to Alleviate Capacity Pressure on Amity Elementary School by Adding the Fifth Grade to the Middle School. The District Is Interested in Creating the New Middle School on the Existing High School Site Resulting in a Shared-use Facility. The Scope of the Middle School Replacement Will Include Renovation of Existing High School Spaces as Well as Additional Square Footage. All Displaced High School Programs Will Need to Be Accounted for Within the New/renovated High School Facilities. The New Middle School Scope May Include Eight New Classrooms at the High School Site as Well as Renovated Science, Gymnasium, and Classroom Spaces. An Assessment of Existing Mechanical, Electrical, and Plumbing Systems Will Need Further Study to Determine the Extent of Systems Replacements Required. All Amity High School Programs Displaced by the Middle School Addition Will Need to Be Relocated to the Newly Designated High School Portion of the Site. The Work May Include a New Competition Gymnasium With Associated Locker Rooms and Team Room, a New Library, New Art and Science Classrooms, as Well as Some New General Education Classroom Spaces. The Existing Amity Elementary School Will Be Getting New Security Updates Potentially, Including but Not Limited to Door Access Controls and a Secured Vestibule at the Front Entry. Selected Firms Will Be Expected to Start Immediately After Board Award and Receipt of a Notice to Proceed (Ntp). Amity Middle School and High School: Design: September 2022 – July 2023 Permit/Bid: Date July 2023 Construction: Date August 2023 – August 2023 Amity Elementary School: Design: September 2022 – January 2023 Permit/Bid: Date February 2023 Construction: Date June – August 2023 The District Reserves the Right to Reject Any Proposal Response Not in Compliance With All Prescribed Public Procedures and Requirements and to Waive Informalities in This Request for Proposals Response Process.

Under Construction

Educational

$25,000,000.00

Public - City

Addition, Demolition, Remodeling, Site Work

4

7

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
67
Bidding Soon
1,132
All Active Projects
437
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

img_map_placeholder

Multiple Locations, Amity, OR


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.