BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Mohawk, New York. Completed plans call for the renovation of a municipal facility.

The Town of German Flatts is requesting sealed bids for the Roof Replacement on the Town Highway Garage. The scope of services includes the removal of the existing metal roof and wood purlins followed by replacement of the purlins and new metal roof. Site visits can be arranged by contacting the Town Office at 315-866-4960. The Contractor shall complete all the work covered by the Contract as soon as possible but no later than 60 calendar days 1. GENERAL DESCRIPTION OF THE WORK: Supply all materials, labor and equipment to replace the existing 3/12 pitch roof on the 90' x 120'Highway Garage located at 3730 State Route 168 Mohawk NY. 1. Remove existing metal roofing from building (existing roofing material will remain onsite) 2. Replace all 2x4 roof purlins with #2 grade lumber or equivalent 3. Replace multiple sill plate framing materials beneath truss bottom cord and concrete block wall, in kind. Anchor replacement sill plate to concrete block wall every 4' o.c and install a truss tie anchor on each truss to the replacement sill plate. 4. Install new 26 gauge steel galvalume imperial rib roofing with rake edge and vent ridge(standard color tbd) at the roof peak for ventilation (ex. Profilevent, Versavent or equal) 5. 1%" self-sealing screws w/neoprene washers color matched to roofing color 6. The existing building has no gable overhangs and the new roof purlins and roof steel will extend to incorporate a minimum 12" gable overhang with 2x6 gable fascia, install additional blocking as necessary. Soffit to be nailed min. every 12". 7. Each of the existing 120' building eaves have 2x8 sub fascia with 12" and 24" overhangs respectively. Replace 2x8 sub fascia and install additional blocking of the 4' truss ends for soffit and fascia nailing as required. 8. All overhangs to have white 1" steel drip edge with closure strip between drip edge and roof steel. 9. All 2x6 and 2x8 fascia will be covered with white min. 024" aluminum fascia material (ex. NEG or equal). All gable overhangs will have solid triple 4" vinyl soffit and eave overhangs will have fully vented vinyl triple 4" soffit.

Post-Bid

Municipal

$417,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
80
Bidding Soon
1,079
All Active Projects
560
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

September 29, 2022

img_map_placeholder

To Be Determined, Mohawk, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.