Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a municipal facility in Winter Garden, Florida. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.
The City of Winter Garden is soliciting statements of qualifications from individuals or firms interested in providing Construction Manager at Risk (CMAR) services for the Crest Avenue WWTF Expansion Planning level construction costs range from $38M to $50M. The City, through written inquiries, will receive questions regarding the RFQ. The deadline for receipt of written inquiries is Tuesday, July 26, 2022, by close of business. Submit such inquires via email to Bob Bryant at robert.bryant3@atkinsglobal.com Construction Begins 8/7/2023 Substantial Completion 8/7/2026 The City, in cooperation with Atkins (Engineer), considered several process alternatives to maximize the treatment capacity of the facility and ultimately a 5-stage membrane bioreactor (MBR) was selected and further analyzed in detail as the preferred alternative. The MBR process selection, utilizing hollow-core fiber membranes, allows for repurposing of existing clarifier volumes within the concrete process tanks, as well as demolition of both the in-service disk filters and the decommissioned traveling bridge filters. Process analysis and optimization efforts conducted at the preliminary engineering phase demonstrate a future permit capacity target for the facility at 7.5 mgd AADF with a 2.0-peak-day-flow multiplier, resulting in a hydraulic plant capacity of 15 mgd. Figure 2 presents the anticipated demolition plan. Figure 3 depicts the proposed site plan. The proposed improvements to attain the permit capacity of 7.5 mgd AADF are as follows Shortlist Confirmed
Award
Municipal
$50,000,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 2, 2022
August 7, 2023
101 E Crest Ave, Winter Garden, FL
Related To This Project
Winter Garden, FL
Bid Date: Sep 23 2022
Winter Garden, FL
Bid Date: Sep 22 2022
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Oct 26 2023
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Nov 16 2021
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.