Renovation of an educational facility in Cheboygan, Michigan. Completed plans call for the renovation of a educational facility.

A. The Cheboygan Area High School is located at 801 W. Lincoln Ave. in Cheboygan, Michigan. Seidell Architects, Todd Seidell is the Owner's Representative and may be contacted regarding any questions, phone 989-731-0372 B. The project consists of installing Versico's VersiWeld TPO Mechanically-Fastened Roofing System as outlined below: : Apply the VersiWeld Mechanically Attached Roofing System with the RhinoBond TPO Welding Plate in conjunction with (2) layers of 2" flat and (1) fully tapered polisocyanurate insulation system after removal off all existing stone ballast and existing roofing systems to expose the existing roof deck for verification of suitable substrate as specified in this specification. Existing stone ballast to be removed from the construction site. A. Provide all labor, material, tools, equipment, and supervision necessary to complete the tear off and installation of the VersiWeld reinforced TPO (Thermoplastic Polyolefin) membrane Mechanically Attached Roofing System including flashings and insulation as specified herein. And as in accordance with the manufacturer's most current specifications and details. B. The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. C. The roofing contractor shall confirm all given information and advise the building owner, prior to bid, of any conflicts that will affect their cost proposal. D. Any contractor who intends to submit a bid using a roofing system other than the approved manufacturer must submit for pre-qualification in writing fourteen (14) days prior to the bid date. Any contractor who fails to submit all information as requested will be subject to rejection. Time is of the essence to the owner. A construction schedule will be developed and will need to be followed. We plan to begin work in mid-July, 2022 (one week after school ends) and to be completed by mid-August, 2022 (two weeks before school begins).

Bid Results

Educational

$389,792.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
13
Bidding Soon
134
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

August 5, 2022

img_map_placeholder

801 W Lincoln Ave, Cheboygan, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.