BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 21, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Cape Coral, Florida. Completed plans call for site work for a water / sewer project.

The planned Scope of Work described in this Invitation to Bid # BUT2297KR, Master Pump Station 100, Influent and Discharge Force Mains includes, but is not limited to, the following: * An influent force main system conveying wastewater from existing Master Pump Station 103 to Master Pump Station 100 (MPS100). The influent force main system consists of 1,700 feet of new 16-inch open cut PVC piping combined with an existing 16-inch "dry" line, 4,100 feet in length, that was previously installed when improvements to 47th Terrace were constructed. The influent piping system also includes an 800-foot HDD installation of 18-inch DR11 HDPE piping in a 24-inch HDPE DR13.5 casing in Cape Coral Street. *A discharge force main system conveying wastewater from MPS 100 to a connection point with new force main piping being designed by Johnson Engineering that will eventually discharge to the City's Southwest Water Reclamation Facility (WRF). The discharge force main is approximately 7,000 feet of 20-inch PVC piping installed by open cut construction. *MPS 100 will be constructed by Others under a separate contract. This force main project and the MPS 100 project will both be constructed at approximately the same time. A connection point between the two force main piping systems and the yard piping associated with the MPS 100 project has been established at the site property line and is shown on the Drawings. *A new fiber optic conduit system with pull boxes will be installed running parallel to the discharge force main as shown on the Drawings. Actual fiber optic cable will be installed By Others at a later The last day for questions to be received in writing to krose@capecoral.net will be by 4:00 PM (local) on Monday, July 18, 2022

Post-Bid

Water / Sewer

$850,000.00

Public - City

Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
77
Bidding Soon
963
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2022

August 26, 2022

Project location map

Multiple Locations, Cape Coral, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.