Site work and paving for a bridge / tunnel in Paonia, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Award Details Contract Award Date: Aug 10, 2022 Contract Award Number: 1240LT22C0053 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: TCK7C1U8EMH9 Contractor Awarded Name: MEDVED GLOBAL INC Contractor Awarded Address: Cortez, CO 81321-8805 USA Base and All Options Value (Total Contract Value): $66280.00 West Muddy #5 is an existing timber deck bridge stream crossing located on NFSR 265 Hightower Road on the Paonia Ranger District of the Grand Mesa National Forest. This existing bridge has inadequate loading requirements to accommodate the weight of timber log trucks that will be used to transport timber harvested in that area. To accommodate the loading requirements the Forest Service will be installing a Big R prefabricated temporary bridge to accommodate the additional loading. This work will require delivery and installation of said structure. Additionally, crushed gravel and common earth fill will be required for the bridge approaches. Geotextile wrapped, gravel filled Geocell foundational support will also be required under the temporary bridge sills. A traffic control plan will be required to direct traffic during construction. Optional bid item for this project will be streambank stabilization to protect the current bridge abutment that is failing. This will require the installation of 60 linear feet of crushed rock riprap over nonwoven geotextile along the streambank approach. Also included in the optional bid item is obstruction removal of an existing beaver dam upstream of the bridge. The project is in an isolated area located in the Rocky Mountains. Weather and environmental stress will be a consideration. The total vision of this project is to install a high quality, temporary bridge to protect current historical resources as well as provide safe passage for commercial haul of timber. Project Location: The project is located at Latitude LATITUDE: 39.127444 LONGITUDE: -107.558288 on NFSR 265 Hightower Road on the Paonia Ranger District of the Grand Mesa National Forest. Access to the site will require driving on gravel surfaced back country roads. In accordance with FAR 36.204, the estimated magnitude of construction for this project is Between $100,000 and $250,000 (If Optional Items are awarded) Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative's contact information can be found at the following website: https://www.aptac-us.org/. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency. Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$66,280.00

Public - Federal

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
108
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.