EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2022 at 8:00 PM

Updated September 15, 2023

Site work and outdoor lighting for a road / highway in Tuscola, Texas. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

For Ps&e Package Questions Call: Paul Norman 1350 N Arnold Blvd Abilene, Tx 79603 325/690-9821 Etclength: 0mi Time for Completion: 58 Working Days For Questions Regarding a Proposal Call 512/416-2498 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Taylor0006-18-064leggett Dr Bi 20-rstp 2022(970)hesross Ave Length: Miles Scurry0053-09-076750 Ft North of Cr 4106 Us 84stp 2022(970)hescr 4126 Length: Miles Scurry0053-10-045cr 4126 Us 84stp 2022(970)hesnear Cr 4134 Length: Miles TXDOT - BI 20-R - Install Illumination

Award

Roads / Highways

$989,712.00

Public - State/Provincial

Outdoor Lighting, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Derricks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
136
All Active Projects
66
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2022

September 2, 2022

img_map_placeholder

BI 20-R, Tuscola, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.