BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a civil project in Brownstown, Indiana. Completed plans call for the renovation of a water / sewer project.

The construction of the Brownstown Utility Improvements Project, Contract A - WWTP & Lift Station Improvements. All interested citizens are invited to attend and should any citizens require special provisions, such as handicapped modifications or non-English translation personnel, the Town will provide such provisions as long as the request is made by July 11, 2022. The Work shall include: The Work at the Vallonia Road Lift Station shall include the installation of three (3) new submersible pumps and guide rails; five (5) plug valves; three (3) check valves; one (1) 10" magnetic flow meter; one (1) 48" diameter meter vault; one (1) jib crane furnished with an electrical hoist and concrete base; one (1) emergency generator and concrete pad; one (1) control panel; one (1) electrical junction box; the replacement of three (3) air release valves on the existing 10" force main; site fencing, and asphalt drive modifications. Additional work shall include the demolition of the existing jib crane and concrete base, the demolition of the existing emergency generator and concrete pad, and the relocation of the existing utility pole; coatings; electrical; instrumentation and controls; excavation; dewatering; regrading; site work; clean up, and all other work and appurtenances necessary for a complete installation. The Work at the Bob Thomas Lift Station shall include the installation of one (1) 72" diameter wet well; one (1) 60" diameter valve vault; two (2) new submersible pumps and guide rails; four (4) plug valves; two (2) check valves; one (1) 4" magnetic flow meter; one (1) 48" diameter meter vault; one (1) emergency generator and concrete pad; one (1) control panel; the replacement of one (1) air release valve on the existing 4" force main; site fencing, and crushed stone drive modifications. Additional work shall include the demolition of the existing wet well and valve vault; yard piping; coatings; electrical; instrumentation and controls; excavation; dewatering; regrading; site work; clean up, and all other work and appurtenances necessary for a complete installation. The Work at the Brownstown Wastewater Treatment Plant shall include the replacement of one (1) rotary drum screen; one (1) grit classifier; two (2) secondary clarifier mechanisms and equipment, and one (1) ultraviolet light disinfection system. Additional work shall include the construction of a new Plant potable water line, including approximately 175 LF of jack-and-bore installation with a 12" steel casing in compliance with CSX Transportation requirements; replacement of the Blower Building roof with metal roofing; replacement of the Administration Building roof with metal roofing; repainting of the Blower Building wooden fascia; installation of metal snowguards on the UV Building, Belt Press Building, Maintenance Garage, Headworks Structure, and Blower Building; replacement of gutters and downspouts on the Belt Press Building, UV Building, and Maintenance Garage; demoli well; one (1) 60" diameter valve vault; two (2) new submersible pumps and guide rails; four (4) plug valves; two (2) check valves; one (1) 4" magnetic flow meter; one (1) 48" diameter meter vault; one (1) emergency generator and concrete pad; one (1) control panel; the replacement of one (1) air release valve on the existing 4" force main; site fencing, and crushed stone drive modifications. Additional work shall include the demolition of the existing wet well and valve vault; yard piping; coatings; electrical; instrumentation and controls; excavation; dewatering; regrading; site work; clean up, and all other work and appurtenances necessary for a complete installation. The Work at the Brownstown Wastewater Treatment Plant shall include the replacement of one (1) rotary drum screen; one (1) grit classifier; two (2) secondary clarifier mechanisms and equipment, and one (1) ultraviolet light disinfection system. Additional work shall include the construction of a new Plant potable water line, including approximately 175 LF of jack-and-bore installation with a 12" steel casing in compliance with CSX Transportation requirements; replacement of the Blower Building roof with metal roofing; replacement of the Administration Building roof with metal roofing; repainting of the Blower Building wooden fascia; installation of metal snowguards on the UV Building, Belt Press Building, Maintenance Garage, Headworks Structure, and Blower Building; replacement of gutters and downspouts on the Belt Press Building, UV Building, and Maintenance Garage; demolition of the existing equipment at the various locations; coatings; electrical; instrumentation and controls; excavation; dewatering; regrading; site work; clean up, and all other appurtenances necessary to complete installation of work as specified and as shown in the Contract Documents. Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid. The Contract will be awarded in accordance with the provisions of IC 5-16-13 for Public Works projects awarded after June 30, 2015. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference. A conditional or qualified bid will not be accepted. Award will be made to the low, responsive, responsible bidder and must be approved by the Indiana Office of Community and Rural Affairs and the State Revolving Fund Loan as administered by the Indiana Finance Authority. The low, responsive, responsible bidder must not be debarred, suspended, or otherwise be excluded from or ineligible for participation in federally assisted programs under Executive Order 12549. Submission of a signed Bid by the Bidder constitutes acknowledgment of and acceptance of all the documents and terms and conditions of the ContractualLegal Requirements and Technical Sections of the specifications in the Project Manual. The Contractor to whom the Work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Contractor to whom the Work is awarded will be required to purchase and maintain insurance coverage as described in the Contract Documents on an "occurrence basis". The construction of the project is expected to be funded in part by a grant from the Department of Housing and Urban Development, as administered by the Indiana Office of Community and Rural Affairs through its Wastewater Program. The construction of the project is also expected to be funded in part by a State Revolving Fund (SRF) as administered by the Indiana Finance Authority. The Contractor to whom the Work is awarded shall comply with all requirements of said agencies. Neither the United States nor any of its departments, s or will be a party to this Advertisement for Bids or any resulting contract. In accordance with the Davis-Bacon requirements, all contractor and subcontractors are required to pay not less than the Federal prevailing wage rates published by the U.S. Department of Labor for each classification of Work performed on this project. Bidders on this Work shall be required to comply with the provisions of the President's Executive Order No. 11246, as amended. Bidders shall also comply with the requirements of 41 CFR Part 60-4 entitled "Construction Contractors Affirmative Action Requirements". A copy of 41 CFR Part 60 - 4 may be found Section 00720 of the Specifications. Section 3 of the Housing and Urban Development Act of 1968 provides that to the greatest extent feasible, training and employment opportunities shall be made available to lower-income residents of project areas and that contracts be awarded to small businesses located within the project area or owned in substantial part by project area residents. Bidders are notified that there is a 7% MBE and 5% WBE participation goal on this project. The Bidder's attention is also called to the "Minority/Women Business Participation" requirements. The Office of Community and Rural Affairs has adopted a State goal of 10% participation for minority and female-owned businesses for construction-related or purchase-related contracts for the Work. The Contractor must meet guidelines and practices established by the Indiana Office of Community and Rural Affairs and appropriate Federal regulations including: 1) Executive Order 11246; 2) Section 3 of the Housing and Community Development Act of 1968 as amended; 3) Certification of Non-Segregated Facilities; 4) OMB Circular A-102; 5) Title VI of the Civil Rights Act of 1964; 6) Section 504, Rehabilitation Act of 1973; 7) Age Discrimination Act of 1975; 8) Executive Order 12138; 9) Conflict of Interest Clause; 10) Retention and Custodial Requirements for Records Clause; 11) Contractors and Subcontractors Certifications; and others that may be appropriate or necessary. Any contract(s) awarded under this Advertisement for Bids are expected to be funded in part by a grant from the Department of Housing and Urban Development, as administered by the Indiana Office of Community and Rural Affairs. Neither the United States nor any of its departments, agencies or employees is or will be a party to this Advertisement for Bids or any resulting contract. Pursuant to Chapter 5, 5-4 of the Labor Standards Administration and Basic Enforcement Handbook 1344.1 Rev 2; "No contract may be awarded to any contractor that is debarred, suspended or otherwise ineligible to participate in Federal or Federally assisted contracts or programs. Any contract awarded to a prime contractor or subcontractor that is found to be ineligible for award must be terminated immediately." Prior to contract award prime contractors are to be actively registered or seeking registration with SAM.gov to determine eligibility/debarment status. In addition, the Contract Division procurement is subject to the Federal Regulations contained in the OMB Circular A-102, Sections B and O and the State of Indiana requirements contained in Indiana Code 36-1-9 and Indiana Code 36-1-12. For contracts over $300,000.00, in accordance with IC 5-16-13-10 and IC 8-23-10-0.5, Contractor must be qualified under either IC 4-13.6-4 or IC 8-23-10 (Indiana Department of Administration or Indiana Department of Transportation) before doing any Work on a Public Works project. In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner, and contractors of any tier as defined in IC 5-16-13-4, will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify program (effective July 1, 2011), and comply with the reporting requirements of IC 5-16-13-11. In accordance with IC 5-16-13-11, Contractor shall submit an Employee Drug Testing Plan with their Bid and contractors of any tier as defined in IC 5-16-13-4 must comply with the drug testing requirements set forth in IC 4-13-18. Contractors shall complete a Drug Testing Plan Certification to be submitted with their Bid. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 90 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive

Award

Water / Sewer

$3,705,065.00

Public - City

Renovation

58

20

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
76
Bidding Soon
1,293
All Active Projects
588
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 18, 2022

August 17, 2022

img_map_placeholder

Multiple Locations, Brownstown, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.