BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Green Bay, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. In general the work consists of: removing of existing asphaltic pavement and concrete pavement, saw cutting asphalt and concrete, shaping and compacting the base aggregate, placing concrete and hot mix asphaltic pavement. Additional work includes curb & gutter concrete sidewalk, erosion control, pavement marking, traffic control, drainage improvements, and site restoration. Estimate Construction Cost $234,000

Bid Results

Sidewalks / Parking Lot

$268,685.00

Public - State/Provincial

Paving, Site Work

22

14

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
29
Bidding Soon
440
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

June 30, 2023

Project location map

2420 Nicolet Dr, Green Bay, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.