Site work and paving for a road / highway in Mellen, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of November 30, 2022, engineer has been awarded and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: Perpetuation project with a thin mill and overlay to resurface 11.4 centerline miles of STH 77 between the towns of Upson, Iron belt, Pence, Montreal, and Hurley, in Iron County. The project also includes paved shoulder widening, curb and gutter repair, inlet repair, repair/replace beam guard, and investigate/replace all curb ramps for ADA compliance. A section of storm sewer in the Town of Iron Belt will be investigated. Anticipated Construction Cost: $3,000,000-$3,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. The method of contractor selection has not been determined at this time. Wis DOT - NC-01 - RFP Engineering - Perpetuation - Resurfacing - STH 77 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Roads / Highways
$4,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2023
WI-77, Mellen, WI
Related To This Project
Mellen, WI
Bid Date: Dec 16 2022
Mellen, WI
Bid Date: Feb 20 2019
Mellen, WI
Bid Date: May 02 2022
Mellen, WI
Bid Date: Jun 22 2022
Mellen, WI
Bid Date: Aug 16 2022
Mellen, WI
Bid Date: Aug 31 2022
Mellen, WI
Bid Date: Sep 21 2022
Iola, WI
--
Wittenberg, WI
--
Merrill, WI
--
Muskego, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.