Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 30, 2025 at 8:00 PM
Updated July 31, 2025
Renovation of a water / sewer project in Foster City, California. Design plans call for the renovation of a water / sewer project.
This project provides for the removal of 2 non-functioning lagoon pump engines, impellers, shafts, and associated plumbing that were abandoned in place when the two current pumps were installed in 2001, so that a third functioning lagoon pump may be installed. Studies have shown that from 1974 to 2019 storms have become more severe and frequent due to climate change effects. When a significant storm event is happening, there are short durations when both lagoon pumps have been in operation and the lagoon level continued to rise. This project will add a third pump to the existing lagoon pump station which will provide the City with the redundancy to reduce the risk of flooding should a failure occur to either of the two existing pumps during a severe storm and high tide condition. The two existing lagoon pumps were replaced in 2001 and are 20 years old. Although the useful life is approximately 35 years, if one were to fail, it could take several weeks to repair. In recent years, there have been incidents in which debris, tires, etc. have caused a pump to fail. If this were to occur during a storm event, it would be catastrophic. Adding a third pump would allow for uninterrupted operation, redundancy, staggered replacement of the lagoon pumps, and provide maximum protection against the potential for flooding and property damage. This project is included in the City of Foster City's Preliminary 2024-2028 Budget Document. Per the owner, as of July 30, 2025, this project is in the design stage, and an architect has been named. A general contractor has not yet been chosen and a timeline for construction has not been determined.
Design
Water / Sewer
$2,000,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 5, 2026
To Be Determined, Foster City, CA
Related To This Project
Foster City, CA
Bid Date: Apr 29 2024
Foster City, CA
--
Foster City, CA
--
Foster City, CA
Bid Date: Aug 02 2022
Foster City, CA
Bid Date: Nov 19 2024
Foster City, CA
Bid Date: Aug 23 2022
Foster City, CA
Bid Date: Feb 16 2023
Foster City, CA
--
Foster City, CA
--
Foster City, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
