Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Milwaukee, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.
of November 30, 2022, engineer has been awarded and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: 2040-23-00 Mill 4" and resurface 4" approximately 0.5 miles of STH 100 from STH 38 to Shepard Ave within the city of Oak Creek. Curb ramps will be evaluated for compliance. Signals will be fully reconstructed at STH 100 and Shepard Avenue with montubes, radar detection, and base-patch loops Anticipated Construction Cost: $10,000,000-$10,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Resurfacing Ryan Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Roads / Highways
$10,999,999.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2023
STH 100N, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Oct 19 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Oct 27 2022
Milwaukee, WI
Bid Date: Nov 04 2022
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Nov 04 2022
Milwaukee, WI
Bid Date: Nov 24 2022
Milwaukee, WI
Bid Date: Oct 26 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Nov 04 2022
Milwaukee, WI
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.