BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Fallon, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Type: District-2 Contract Cost Range: R19 ($1,550,000.01 to $1,850,000) Funding Type: STATE County(s): Churchill Enterprise Goal: 4.7 % Location: SR 361 2" overlay with areas of patching Route(s): SR361-1 Milepost(s): MP CH 11.00 to MP CH 15.69 Contract Days: 25 (working) Liquidated Damages: $5,200.00 Project Length: 5.0000 mi NVDOT - Overlay With Areas of Patching *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,994,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
23
Bidding Soon
237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

September 5, 2022

Project location map

NV-361, Fallon, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.