BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Alma, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

As of January 3, 2023, an engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: The pavement and structures need treatment to extend their service lives. 7160-00-03: is 1.644 miles on STH 35 from S Junction Riverview Drive to Buffalo Rive, City of Alma, and includes replacing pedestrian railing, concrete surface repair to pedestrian railing post bases, Methacrylate Flood Seal to deck, replacing concrete approach slabs, and replacing sidewalk approaches on B-06-0138, replacing beam guard, roadside clearing, and curb ramp replacement. Stage bridge construction half at a time using temporary traffic signals. BNSF Railroad runs parallel to the Project. Railroad Coordination will be required with a longitudinal agreement needed with BNSF RR. Anticipated Construction Cost: $3,000,000-$3,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - NW-07 RFP Engineering - Perpetuation - Resurfacing

Conceptual

Roads / Highways

$4,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
41
Bidding Soon
724
All Active Projects
290
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

img_map_placeholder

WI-37, Alma, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.