Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Milwaukee, Wisconsin. Conceptual plans call for the construction of a municipal facility.
As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2023. *The closed solicitation has been included below for reference: The West Allis Service Facility (WASF) houses three distinct functions within three buildings on its Hawley Road site: Southeast Region (SER) Electrical Unit Shop & Warehouse; SER Materials, HMA & Soils Testing Laboratory; and Bureau of Traffic Operations (BTO) Signal Cabinet Shop. Constructed in the 1980s, the WASF consists of three buildings and outside on-site storage on a 5.55 acre site. This facility requires modernization at the existing site or functional replacement at a new site Stage 1 Contract: Building upon a previous feasibility study and additional review/interviews, prepare a functional and condition assessment of the existing facility; develop a conceptual building layout, site plan, and cost estimate of existing facility modernization; develop a conceptual building layout, site plan, and cost estimate of functional replacement; for the preferred alternative, continue building plan concepts and site plan design development through 30% completion. Anticipated services include site development and site circulation design, architectural design, building engineering and related services. The selected consultant will coordinate extensively with WisDOT for assessment of the existing and potential new sites. The functional replacement conceptual building layout and site plan should be applicable to a range of parcel sizes and configurations. A future staged contract could include final plan development of site and building design of the preferred alternative to PS&E. Anticipated Construction Cost: $20,000,000-$24,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date: 08/03/2022 Interview Place: Southeast Region Office; 141 NW Barstow St.; Waukesha, WI 53187 The method of contractor selection has not been determined at this time. WisDOT - SE 01 RFP Design - Modernization - WASF facility
Conceptual
Municipal
$25,000,000.00
Public - State/Provincial
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2024
W Washington St, Milwaukee, WI
Related To This Project
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Oct 19 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Oct 27 2022
Milwaukee, WI
Bid Date: Nov 04 2022
Milwaukee, WI
Bid Date: Nov 04 2022
Milwaukee, WI
Bid Date: Nov 24 2022
Milwaukee, WI
Bid Date: Oct 26 2022
Milwaukee, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Nov 04 2022
Milwaukee, WI
Bid Date: Oct 20 2022
Milwaukee, WI
Bid Date: Nov 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.