BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Milwaukee, Wisconsin. Conceptual plans call for the construction of a municipal facility.

As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2023. *The closed solicitation has been included below for reference: The West Allis Service Facility (WASF) houses three distinct functions within three buildings on its Hawley Road site: Southeast Region (SER) Electrical Unit Shop & Warehouse; SER Materials, HMA & Soils Testing Laboratory; and Bureau of Traffic Operations (BTO) Signal Cabinet Shop. Constructed in the 1980s, the WASF consists of three buildings and outside on-site storage on a 5.55 acre site. This facility requires modernization at the existing site or functional replacement at a new site Stage 1 Contract: Building upon a previous feasibility study and additional review/interviews, prepare a functional and condition assessment of the existing facility; develop a conceptual building layout, site plan, and cost estimate of existing facility modernization; develop a conceptual building layout, site plan, and cost estimate of functional replacement; for the preferred alternative, continue building plan concepts and site plan design development through 30% completion. Anticipated services include site development and site circulation design, architectural design, building engineering and related services. The selected consultant will coordinate extensively with WisDOT for assessment of the existing and potential new sites. The functional replacement conceptual building layout and site plan should be applicable to a range of parcel sizes and configurations. A future staged contract could include final plan development of site and building design of the preferred alternative to PS&E. Anticipated Construction Cost: $20,000,000-$24,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date: 08/03/2022 Interview Place: Southeast Region Office; 141 NW Barstow St.; Waukesha, WI 53187 The method of contractor selection has not been determined at this time. WisDOT - SE 01 RFP Design - Modernization - WASF facility

Conceptual

Municipal

$25,000,000.00

Public - State/Provincial

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
71
Bidding Soon
1,195
All Active Projects
476
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2024

img_map_placeholder

W Washington St, Milwaukee, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.