BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Savannah, Georgia. Completed plans call for the construction of a 3,000-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; and water / sewer project.

This is an FY 2022 SRM Construction project supporting the Georgia Air National Guard (GA ANG). The proposed primary facility for this project consists of the ACS Weapons System Facility. Included in the facility are a secured open-storage facility encompassing an office area and a storage area for housing two trailers, and tele/data/elec wiring to support Agency installation of Weapon System equipment resulting in a complete and useable facility. Also included are Anti-Terrorism/Force Protection (ATFP) measures. The structure is anticipated to be a pre-engineered metal building or similar construction with eave heights to correspond to the function of the spaces within. The supporting facilities include site preparation, exterior lighting, utilities infrastructure, fire detection/suppression, and communications support. Authorized program scope SF is 3,000 SF The selected contractor will provide the design, erection and installation of the building, raised access flooring, mechanical ductwork and electrical systems, finishes and associated site work with all necessary connections for operation. This project will be subject to the State of Georgia Department of Labor prevailing wage requirements. The selected contractor will provide architectural and engineering services as required for the site investigation and geotechnical design of the building foundations, all utilities and connections, the design of the building and ensure the project conforms to federal and state codes and standards. The building shall be of durable construction for the intended military weapons systems training and use, and compatible in construction and appearance with the surrounding buildings located at the 165th Air Wing at 1401 Robert B. Miller Road, Savannah, GA. The site is located at the 165th Air Wing on Georgia Air National Guard property at 1401 Robert B. Miller Road, Savannah, GA 31403. The site is inside a controlled perimeter of a military installation and surrounded by military facilities. The construction site itself will be on existing impermeable concrete paved surfaces requiring very little stormwater management. There are existing utilities including water lines, sanitary gravity sewer mains, storm sewers, gas, underground electric, data and telephone available reasonably close to the site. Additional specifications and requirments are listed in the attached SOW. ***************************************************************************************************************************************************** Proposal Evaluation Expectations: Your Firm Fixed Price (FFP) proposal is requested and should address, at a minimum, the requirements specified in the Statement of Work dated May 2022. Award will be made to the responsible offeror whose proposal meets the terms and conditions of the Solicitation (RFP) determined to be Technically Acceptable and offers the lowest, reasonable, Total Evaluated Price (TEP) for the sum of CLIN 0001 and CLIN 0002. The existence of adequate price competition is expected to support a determination of reasonableness. Price analysis techniques may be used to further validate price reasonableness in accordance with FAR 15.4. We intend to award without the use of discussions but reserve the right to do so. Offerors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing exists when, despite an acceptable TEP, the price of one or more CLINs are significantly overstated or understated as indicated by the application of price analysis techniques. An overstated or understated CLIN price may be due to (a) illogical progression of rates, factors or unit prices, (b) unit prices that do not take into account quantity variations, or (c) the "front loading" of CLINs; any of these situations would reflect an inaccurate "true" cost for that CLIN. Offers that are determined to be unbalanced may be rejected if the lack of balance poses an unacceptable risk to the Government. Proposal shall include: Bid Schedule, Narrative Work Plan- including phasing, AF3064 - Contract Progress Schedule, AF3065- Contract Progress Report and AF 3052 as well as any other applicable attachments listed in the SOW dated May 2022. If one of the above is not received or incomplete, the proposal will be deemed technically unacceptable, and the next lowest bidder will be evaluated. This will be done until the lowest-price and technically acceptable proposal is received. **************************************************************************************************************************************************** ***SITE VISIT INFORMATION*** There will only be one site visit, so if you plan to attend, make sure that any applicable subcontractors accompany you if applicable. The site visit will be held on Tuesday, August 2, 2022 at 9:30AM ET. Address: 1401 Robert B Miller Jr Drive, Garden City, GA 31408 We will meet at the Davidson gate- location map is attached. The ANG will shuttle everyone onto the installation. Please have a valid driver's license. If you plan to attend the site visit, please contact Becky Janssen at kimberly.janssen@us.af.mil, by 29 July 2022 and advise how many people will be with you, so that we can ensure enough shuttles are available the day of. ***You will notice on the attached solicitation that the due date is 18 Aug 2022, but the correct due date is 22 Aug 2022 as stated in this posting.*** YOU MUST BE REGISTERED ON THE BELOW WEBSITES TO BE CONSIDERED FOR AWARD https://www.sprs.csd.disa.mil/ https://www.dol.gov/agencies/vets/programs/vets4212 All Rfis Must Be Submitted by 9 Aug 2022 at 1:00pm Et. Any Rfis Received After This Date Are Not Guaranteed to Be Answered by the Time Proposals Are Due and Late Rfis Will Not Constitute an Extension in the Proposal Due Date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - A022659

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$5,000,000.00

Public - Federal

New Construction, Site Work

30

31

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
25
Bidding Soon
493
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

January 2, 2023

img_map_placeholder

1401 Robert B Miller Rd, Savannah, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.