BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a pipeline in Big Lake, Texas. Completed plans call for site work for a pipeline.

City of Big Lake Gas Line Installation Bids will be immediately opened following the close of the Bid Period. Any Bid received after closing time may be returned unopened. Proposals may be modified or withdrawn at any time prior to the time set for opening Bids. This project includes, but is not limited to, installation of approximately 2200 linear feet of 6 Gas Line. Bidder should direct questions regarding distribution of Contract Documents for this Project to Plummer Associates, Inc. Direct questions regarding design of the Project to Brian Beach, P.E. Written questions may be submitted by e-mail to bbeach@plummer.com. Proposals shall be accompanied by either a Bid Bond from a surety satisfying the requirements specified below for the Performance Bond, Payment Bond and any other bonds set forth in the Contract Documents, or certified check upon a national or state bank in an amount not less than 5 percent (5%) of the total maximum bid price, payable without recourse to Oilfield Water Logistics as a guarantee that the Bidder will within ten (10) days after Notice of Award enter into a Contract and furnish a Performance Bond, Payment Bond and any other bonds set forth in the Contract Documents upon the forms provided, each in the amount of 100 percent (100%) of the Contract price, from a surety licensed to conduct business in the state where the Project is located and named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. The surety shall have an "A" minimum rating of performance and a financial rating strength of five times the Contract price, all as stated in current "Best's Key Rating Guide, Property-Liability." Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety, and shall be certified to include the date of the Bond. Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. The OWNER reserves the right to accept or reject any or all Bids or parts of Bids, to waive any formalities and technicalities and to accept the Bid most advantageous to the OWNER. No bid may be withdrawn until the expiration of sixty (60) days from the date bids are opened.

Post-Bid

Pipeline

$80,000.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
10
Bidding Soon
204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2022

August 4, 2022

Project location map

To Be Determined, Big Lake, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.