BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2024 at 7:00 PM

Updated March 7, 2024

Site work and renovation of a mixed-use development in El Dorado, Arkansas. Design plans call for the renovation of a municipal facility; and for site work for a transportation facility.

Per the owner, as of March 6, 2024, an award has been made for this solicitation. The owner states that they do not have a general contractor yet and they do not have a timeline of the project as they are still working through items with Union Pacific. Closed solicitation has been included below for reference. ......... Request for Qualifications (RFQ) to provide Engineering Services for the construction a rail improvement and transload facility project located in Union County, Arkansas. The projects will be funded with federal funds from the Economic Development Administration (EDA), Successful firms will be required. A selection committee appointed by the County will conduct an evaluation of all proposals submitted in response to the RFQ. Request for Qualifications (RFQ) Package (Form 10) list the requirements of the RFQ Package to be submitted to requesting parties. Instructions for Responding to the RFQ (Form 10-I) list evaluation criteria and instructions for responding to the RFQ. All responses not fully addressing each criterion will be considered non-responsive offers and will be eliminated from consideration as potential contractors. The RFQ Evaluation Package (Form 13) includes the Criteria for Procurement rating sheet as well as the Rating Guidelines, Rating Sheets, and the Procurement Summary Sheets and instructions needed to evaluate qualifications. The proposal receiving the highest total points in the proposal evaluation process will be offered the contract. The County will notify all unsuccessful offerors of the contract award once contract negotiations have been completed. The contract awarded will be a lump sum contract. Engineer service contracts related to this project are subject to Federal restrictions and approval. Union County is an Equal Opportunity/Affirmative Action Employer. The method of Contractor Selection has not been Determined at this time.

Design

Transportation Terminals

$800,000.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
36
Bidding Soon
337
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

Project location map

To Be Determined, El Dorado, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.