BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2026 at 8:00 PM

Updated August 9, 2026

Site work, asbestos abatement and renovation of a mixed-use development in Tuskegee, Alabama. Completed plans call for the renovation of a medical facility; for asbestos abatement for a medical facility; and for site work for a medical facility.

Renate Building 10 at the Central Alabama Veterans Health Care System East Campus. Work consists of construction and renovation activities associated with the Building 10 renovation project, with a construction magnitude between $10,000,000 and $25,000,000. Location: Central Alabama Veterans Health Care System, East Campus, 2400 Hospital Road, Tuskegee, AL 36083. Requests for Information (RFIs) are due by Monday, August 10,2026 by 1:00 PM CST, via email to Chantel.Guest@va.gov. Late RFIs may not be accepted and offerors are responsible of ensuring questions are received on time. Responses to RFIs will be provided in question and answer form via a posted amendment at www.sam.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project will be a complete renovation of the existing Building 10 on the VA Medical Center Campus in Tuskegee, Alabama. Building 10 is a two-story brick building built in 1923. The building is approximately 12,800 GSF and includes an attic and a crawl space. The building is currently vacant and in poor condition. This project is to be a complete renovation of the building and will include abatement of all hazardous materials and demolition of all existing utilities. Demolition of the existing building includes the removal of all finishes, fixtures, interior walls, floors, lighting, electrical distribution, HVAC equipment, fire/alarm systems, IT, and plumbing systems. The renovation will also include the removal and replacement of the building's structure, including the floor and roof slabs, and the roof assembly. The exterior masonry walls will remain and will be shored-up while the renovation is occurring. The existing wood furring and plaster along the inside face of the exterior walls will be removed. All windows and exterior doors will be replaced. The exterior front entrance porch and stairs will be removed and replaced with a porch that reflects the original building design. Canopies will be added over the entry doors at the east and west wings, to reflect the original building design.

GC Bidding

Medical

$25,000,000.00

Public - Federal

Asbestos Abatement, Renovation, Site Work

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
51
Bidding Soon
726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2026

October 5, 2026

Project location map

2400 Hospital Rd, Tuskegee, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.