BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Starke, Florida. Completed plans call for the renovation of a water / sewer project.

CBJTC Wastewater Treatment Plant SCADA Upgrade Project Location: Camp Blanding Joint Training Center, Starke, FL General Statement of Work: Upgrade 9 pump stations, 4 primary wells, 2 water storage tanks, and the wastewater treatment facility incl electrical distribution related to the mechanical scope, conduits and control cabling to support new SCADA and control upgrades for each site; Install 2 new well pumps and motors; Elevation of discharge piping above grade and relocation flow meters; Update controls to allow for flow pacing of chlorine, automation of well operations based on distribution pressure, automatic cutoff based on totalized daily flow; Replace existing right-angle drives with new 125Kw standby generators and ATS at 2 primary wells; Install new pressure and level sensors for elevated storage tanks; Replace existing altitude valves and butterfly valves on storage tank feed lines and provide new access hatches to the valve vaults; Install new chlorine analyzer system; Connection of new chlorine analyzer and existing feed system to standby power; Install new aviation and safety lighting for elevated storage tanks; Install 4 manual transfer switches for portable generators at 2 of the primary wells and 2 of the water storage tanks; Repair of leaks at existing wet well to prevent groundwater intrusion; Provide upgrades to the SBR treatment train to incl updated PLC controls, new submerged mixers, 1 new drive mechanism for decant arm, and air valves; Replace existing sodium hypochlorite and sodium bisulfite chemical feed systems with new pumps and piping; Repair construction joints in wall of all four basins. Estimated Construction Cost: $2 - $2.4 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The method of Contractor Selection has not been Determined at this time

Post-Bid

Water / Sewer

$4,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
48
Bidding Soon
825
All Active Projects
343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

October 3, 2022

img_map_placeholder

5629 FL-16, Starke, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.