BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a road / highway in Moline, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The project is Phase II of the River to River Corridor Trail, which runs along the 19th Street/27th Street corridor between Avenue of the Cities & 36th Avenue (Coaltown Road) in Moline. Moline is actively pursuing funding for this project. Phase II of the River to River Corridor Trail will construct the path from the south side of Avenue of the Cities to the north side of 36th Avenue (Coaltown Road) in Moline. Engineering for Phase II is the purpose of this Request for Statement of Qualifications. A schematic is attached on Page 6 showing the proposed phased construction. Project questions shall be directed to Laura Klauer at (309) 524-2368 or electronically . The SOQ should include a project schedule and estimated completion date. The proposed deadline for Phase I engineering is January 1, 2024, and Phase II engineering July 1, 2024 The method of contractor selection has not been determined at this time .

Conceptual

Roads / Highways

$200,000.00

Public - City

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
92
Bidding Soon
1,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

Project location map

Multiple Locations, Moline, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.