BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in San Diego, California. Completed plans call for the renovation of a 1,121-square-foot military facility.

Plans call for renovation of a 1,121 square foot metal storage shed. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com. The goal of this project is to provide the client a complete and useable facility for UUV servicing and repair. The Contractor (KTR) shall provide all management, tools, supplies, equipment, parts and labor necessary to build and certify this project. The word "provide" in this scope shall mean "to order, purchase, deliver to site, assemble, install per manufacturer's recommendations, connect and test for proper functioning. This Statement of Work (SoW) describes the type and extent of work required under this contract and the KTR'S submitting proposal shall supplement and augment the SoW as required to provide a complete, structurally engineered, turn-key finished product at the end of the project. The KTR shall perform based on construction industry standard practice and in compliance with the applicable manufacturing drawings, specifications, codes, regulations, criteria and other applicable standards specified in delivering this contract requirement to achieve a complete usable finished product, not limited to requirements specified below. The KTR shall produce full sets of Mechanical and Electrical drawings, shop drawings, including plans, diagrams and details as required to document and communicate the design intent. The KTR shall bear the responsibility of obtaining and coordinating all trades, sub-contractors and inspections required in performing the work as specified herein to provide a "Turn-Key" type project. Addendum #1-#3 have been issued as of 8-4-2022.

Post-Bid

Military

$250,000.00

Public - Federal

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
728
All Active Projects
332
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2022

August 31, 2022

img_map_placeholder

140 Sylvester Rd, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.