BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a transportation facility in Washington, Missouri. Completed plans call for the renovation of a transportation facility.

https://www.emissourian.com/local_news/axe-depot-to-open-in-2023-after-council-agrees-to-spend-495k-on-renovating-historic/article_f1ebef9e-2237-11ed-9a70-9bee6b8f3cb1.html Just as the sharp-edge of ax blade splits a tree stump, a proposal to redevelop the historic freight depot into an ax-throwing venue nearly evenly split members of the Washington City Council last Monday evening. At the meeting, members voted 5-3 to spend $496,500 to renovate the freight depot to prepare it for the Axe Depot, a proposed entertainment venue that expects to open in early 2023. Voting in favor of the renovations was First Ward Councilman Al Behr, Second Ward Councilman Mark Wessels, Third Ward Councilman Jeff Patke, Fourth Ward Councilman Mike Coulter and Fourth Ward Councilman Joe Holtmeier. Voting in opposition were Third Ward Councilman Chad Briggs, Second Ward Councilman Mark Hidritch and First Ward Councilman Duane Re ed. "Anyone I have talked to, and I received a few phone calls about this, but spending half a million dollars on a 100-year-old building when we don't own the ground underneath is a problem for me," Re ed said prior to the vote. "I would rather have a roof on the main stage (at the fairgrounds), I would rather have airport hangars. I would rather have a lot of other things rather than spending this much money on this." According to city officials, the ground underneath the freight depot -- a structure that dates back to 1865 -- continues to be owned by Union Pacific. Earlier this month, city officials learned that bids to renovate the depot and to "shore up the western wall" of the depot all exceeded the original $350,000 cost estimate. The three bids were: Franklin County Construction, $496,000; Aspire Construction, $507,540; and SK Contractors, $507,540. "We are talking about a lot of money and who knows what else they are going to find once they get started," Re ed said. He described the renovation plans, which include adding bathrooms, an office space and throwing alleys, as the city's attempt to "polish a turd." According to Washington Attorney Mark Piontek, the renovations are necessary if the council intended to rent the structure to Jessica Hinten and Amanda Nilges, the two owners of the Axe Depot. "Technically (the city) would be in breach of the lease, because the lease does say that you have to do whatever is necessary to obtain a certificate of occupancy," Piontek said. He and other city leaders said the building, in its current state, would not pass inspection. While he agreed with Re ed about being uncomfortable by the size of the investment, Patke said he felt that the investment was the best path forward for the city. "We can say no, and let the building go that the way it is and possibly put something in it for storage," Patke said. "Or we can fix it up, even though it is a lot of money, but secure a historic building. In my book, you have to ask what kind of a price tag you would put on securing the future of a historic building." In a memo to members of the Washington City Council, City Administrator Darren Lamb said maintenance on the building had been deferred for years with two key exceptions. A new roof was installed in 2018, which cost $23,250, and exterior painting was done in 2020, which cost $26,700. Officials with Cochran Engineering, which is acting as the architectural design consultants, testified Monday night that the renovations would be long-lasting and should last for 30 to 40 years. "We are not putting extensive furnishings or finishings on this project," Joe McGowan said. "What we are proposing is really just the minimum to make it usable." City leaders also were split on whether or not the city would ever recoup its investment. For example, Axe Depot will rent the structure for $36,000 per year of the five-year contract. That amount will increase, beginning in the second year, depending on potential increases with the Consumer Price Index. These potential increases are capped at 3 percent annually. "I understand that we want to recoup the construction costs, but we are never going to do that," Re ed said. Other members of the council said having a tenant in the building would generate sales tax revenue, which would help supplement the rent. "Ray Charles can do this math and see that it still doesn't add up," Re ed said. Ultimately, members of the Washington City Council voted 6-2 in favor of the proposed five-year rental contract with Axe Depot. Hinten and Nilges said after the meeting that they are relieved and appreciative to see the contract and renovations be approved. "Thank you for the opportunity to bring this unique experience to Washington," said Hinten, who is a social worker for the state outside of her work with the Axe Depot. Nilges is a middle school teacher. According to the pair, the Axe Depot will likely open late winter or early spring of 2023. They plan to have six throwing alleys and a gathering area within the building, which will be available for party rentals and group outings as well as individuals. The Axe Depot will be open Friday through Sunday. Nilges said they hope to win over skeptics that don't think axe throwing has a place in Washington. "Don't knock it 'til you try it," Nilges said. "You may just really like it." _________________________________________________________________________________________________________________________________________________________________ The Scope of Work includes renovations of the existing Freight Depot and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The City of Washington anticipates issuing notice to proceed on August 2, 2022. The wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962," (P.L. 87-581: 76 Stat. 357) and implementing regulations. Effective January 1, 2009, and pursuant to RSMo 285.530 (1), No business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the state of Missouri. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a tenhour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees. The City of Washington hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The owner intends to award the contract to the most responsive, responsible bidder submitting the lowest bid. The owner reserves the right to reject any and all bids, and to waive any irregularities in the best interest of the owner.

Post-Bid

Transportation Terminals

$500,000.00

Public - City

Renovation

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
67
Bidding Soon
897
All Active Projects
355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

August 22, 2022

img_map_placeholder

401 W Front St, Washington, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.