BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 11, 2022 at 8:00 PM

Updated January 25, 2024

Site work for a water / sewer project in Bells, Texas. Completed plans call for site work for a water / sewer project.

The Greater Texoma Utility Authority (GTUA) (Owner) on behalf of the City of Bells, TX (City) is seeking proposals from Contractors to supply approximately 700 Automated Meter Reading (AMR)- and Advanced Metering Infrastructure (AMI)- compatible water meters and associated software. This water meter replacement project will modernize water infrastructures in Bells through improving data collection and enhancing service. These water meters will ultimately connect to a future Advanced Metered Infrastructure (AMI) system for monitoring and control.connect to a future Advanced Metering Infrastructure (AMI) system for monitoring and control. Submit questions via email to mschmitz@anterogroup.com or gnemeth@anterogroup.com. The envelope must be sealed and clearly marked "WATER METER SUPPLY PROJECT". The Project Consists of: Supply of 700 AMR/AMI-compatible water meters for replacement in the City of Bells, including residential, public, and commercial buildings. Approximately 690 meters are 3/4" or 5/8"; approximately 10 meters are 2" in size. A bid bond in the amount of five percent (5%) of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the Greater Texoma Utility Authority or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. The Greater Texoma Utility Authority reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by GTUA for a period not to exceed 60 days from the date of the bid opening for the purpose of receiving bids and investigating the bidder's qualifications prior to the contract award. The contract will be contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Notice for Bids are expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Notice for Bids or any resulting contract. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, handicap, age or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60 Any contracts awarded under this Notice for Bids is/are subject to U.S. Iron and Steel requirements.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

10

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
60
Bidding Soon
3,778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

November 25, 2022

Project location map

Multiple Locations, Bells, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.