Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Smithfield, Rhode Island. Conceptual plans call for the renovation of a municipal facility.
The current public works facility was built around 1955. In March of 2019, the Department of Public Works contracted with Aharonian and Associates, Inc. of Smithfield, RI, to complete an assessment and Feasibility Study of the existing main garage at 3 Spragueville Road. The intent of this feasibility study was to evaluate the condition of the existing building and determine whether the existing structure can be utilized to provide the Town of Smithfield with a safe and cohesive space for staff, administration and the public. The goal is to make a safe working environment for the staff and visiting public, utilizing facilities such as recycling and administrative inquiries, while separating the Public Works daily operations and maintenance activities, providing a safer work site. There were a number of design and operational deficiencies identified during the study. The existing facility has inadequate ventilation, causing fumes and odors from the vehicle maintenance bays to permeate throughout the building during the day. The building currently does not meet ADA requirements. The maintenance staff does not have access to any vehicle lifts, making routine maintenance more time consuming and dangerous. The existing concrete floor in the work bays are starting to spall and erode from years of exposure to the salt and sand coming off the vehicles. There exists no clear separation between public access and operations space, allowing for potentially dangerous encounters between the visiting public and department vehicles and heavy machinery. An RFQ was advertised and awarded to Aharonian and Associates to design three phases of construction. Phase I design is completed and ready to be advertised for construction. Phase II design was awarded in 2021 and is underway now. Phase III funds were approved in the 2022 budget and will begin after Phase II design is complete. Phase I design addresses the deficiencies in the fleet maintenance area of the building by adding an additional bay with a higher ceiling so lifts can be used to work under the larger vehicles. The new bay will also handle the Fire Department vehicles which will increase the savings to the town. Phase II addresses the crews work area and upgrades to current code and Phase III will address the administrative issues. This project is in included in the Town of Smithfield FY 2023-2027 Capital Improvement Plan (CIP). As of June 29, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$1,250,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2024
3 Spragueville Rd, Smithfield, RI
Related To This Project
Smithfield, RI
--
Smithfield, RI
--
Smithfield, RI
--
Smithfield, RI
Bid Date: May 06 2022
Smithfield, RI
--
Smithfield, RI
--
Smithfield, RI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.