BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a power facility in Lincoln, Nebraska. Completed plans call for site work for a power facility.

Lincoln Electric System is issuing this bid process for the purpose of selecting a contractor to replace the current piping with a different layout, installation of a new filter system, and installation of a new billing meter at the Rokeby Generation Station Site (RGS) Unit 1 which is located at 8000 SW 12th Street, Lincoln, NE 68523. Successful respondent will be required to complete (1) the LES Construction Contract; 2) furnish proof of insurance with coverage specified in the Contract by an insurance company licensed to do business in Nebraska and rated at least B+ in A.M. Bests Rating. Certificate must show LES listed as additional insured for general liability and include waiver of subrogation,

Award

Power Plant

$146,145.00

Public - City

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
86
Bidding Soon
865
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

August 15, 2022

Project location map

8000 SW 12th St, Lincoln, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.