BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Louisville, Kentucky. Completed plans call for site work for a playground / park / athletic field; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Metro Parks and Recreation is requesting bids for constructing a forest play area in Chickasaw Park at 1200 Southwestern Parkway, Louisville, KY 40211. The project includes, site preparation and grading, asphalt or concrete path construction around the play area, under drain installation, drainage connection to existing park green infrastructure, playground amenity installation as shown on the plans Questions Due Date: Jul 11th 2022, 3:00 PM EDT Proposal (Bid) Bond: 4.26.1.1 Proposer is required to furnish a Proposal (Bid) Bond in an amount of not less than five percent (5%) of its base Proposal. This may be in the form of a Proposal (Bid) Bond, Certified Check or Cashiers Check. No personal checks will be accepted. The Proposal (Bid) Bond shall be supplied at the time of the Proposal closing. 4.26.1.2 Proposers security shall be a bond provided by a surety company authorized to do business in Kentucky. Performance Bond: The successful Proposer must submit a performance bond satisfactory to the Metro Government executed by a surety company authorized to do business in Kentucky, or otherwise supplied, satisfactory to the Metro Government, in an amount equal to one hundred percent (100%) of the contract price as it may be increased. Payment Bond: The successful Proposer must submit a payment bond satisfactory to the Metro Government, executed by a surety company authorized to do business in Kentucky, or otherwise supplied, satisfactory to the Metro Government, for the protection of all persons supplying labor and material to the Proposer or its subcontractors for the performance of the work provided for in this Proposal. The bond shall be in an amount equal to one hundred percent (100%) of the original contract price

Post-Bid

Playgrounds / Parks / Athletic Fields

$70,000.00

Public - City

Paving, Site Work

29

6

2

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
35
Bidding Soon
951
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2022

August 18, 2022

img_map_placeholder

1200 Southwestern Pkwy, Louisville, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.