Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and asbestos abatement for a mixed-use development in Bishopville, South Carolina. Completed plans call for the demolition of a residential development; for site work for a residential development; for asbestos abatement for a residential development; water / sewer project; water / sewer project; and water / sewer project.
**As of September 20, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** Bishopville will accept separate sealed bids for the complete demolition and disposal of Twenty-Three (23) residential structures that CONTAIN ASBESTOS, within the city of Bishopville. This project is being funded in whole/in part by the Community Development Block Grant Program. All federal CDBG requirements will apply to the contract. The CDBG Special Contract Provisions will apply. All contractors are required to be registered in the federal System for Award Management. Project Location: Bishopville, South Carolina 1. The contractor will be responsible for demolition, removal, and proper disposal of structures and contents of existing vacant residential buildings. The list of structures to be demolished is included as AttachmentA. 2. The contractor will be responsible for all costs of transport and proper disposal of demolition debris, both Asbestos Containing material and non-Asbestos Containing material. 3. The Contractor will provide a complete compliance history and documentation of site procedures in relation to the abatement and disposal of asbestos and nonasbestos containing materials. 4. The contractor will be responsible for all landfill fees for asbestos containing material. Landfill tickets must be submitted with all invoices in order for payment to be processed. Landfill tickets must clearly show the address and Parcel Number. Demolition for properties must be completed, no partial payment request will be accepted. 5. The contractor will be responsible for obtaining all certifications and permits necessary for the completion of the project from the applicable regulatory agencies. 6. The contractor will be responsible for demolition of all slabs and all underground structures to a depth of two feet below existing finish floor grade. Approved material shall be placed as backfill in all excavated areas and graded to the elevation necessary to provide positive surface drainage to all areas of the site. 7. The contractor is responsible for removing all debris and trash from the entire lot, and the entire lot is to be left in a clean, properly graded, seeded state. Exception for those lots that have multiple units. In this case the area with the unit to be demolished will be cleared according to the discretion of the City of Bishopville. 8. The contractor is responsible for removing all slabs, walkways, driveways, fences, and accessory buildings. 9. The contractor is responsible for all temporary facilities necessary to successfully complete the project to include, but not limited to, portable restrooms, temporary power, temporary water, silt fencing, site security, etc. 10. Caution and care must be exercised to prevent damage to adjacent structures, and to ensure that existing businesses can operate normally without significant disruption during demolition activities. 11. Caution and care must be taken to ensure mature trees are not removed or damaged. 12. The Contractor must comply with SCDHEC Regulation 61-86.1 - "Standards of Performance for Asbestos Projects". 13. All required Air Monitoring during asbestos abatement has been contracted separately and is not the responsibility of the contractor retained under this RFB Clearings Backfill and Compilation Page 3 of 6 1. The contractor shall secure any necessary permits from local agencies and submit notifications to the Health Hazards Control Branch, as applicable, to include a Demolition Permit, any required Tree Permit and a Business License, as applicable. 2. For installation of sediment and erosion control devices, practices, and structures, per current SCDHEC and SCDOT standards. 3. Depressions greater than six inches created by the demolition and removal of items specified must be graded level with adjacent land, as directed by the City of Bishopville. All areas where items specified have been demolished and/or removed, will be seeded as directed by the City of Bishopville. 4. Upon completion of the assigned work, the contractor will provide written verification that all structures have been removed 1. Bringing site to proper grade shall be part of the base bid. Contractor shall bring finished grade to match the sidewalks or to existing materials on all sides of the site. Contractor shall slope finish grade to drain. 2. It is expected that the Contractor will backfill all excavated areas with suitable material, and grade the area to provide for positive surface drainage for the entire site (generally, 0.5% minimum slope from the highest point of adjacent road, curb or sidewalk) 3. Fill shall be for counties classified as Group B per SCDOT standard, section 203.2....1.8, #15. The following soil types are acceptable for use as backfill material in accordance with AASHTO M 145. They are as follows: A-l, A-2, A-3, A4, and A-5. Each layer shall be spread evenly and compacted. Each layer of backfill and the top eight inches of material shall be compacted by approved equipment and the density shall be 98% as determined by the Standard Proctor Test. 4. The Contractor will be responsible for re-seeding the site with appropriate seasonal grass for erosion control, as directed by the City of Bishopville. 5. The Contractor will be responsible for installation of silt fence at the edge of curb or sidewalk to prevent sediment runoff. The Contractor will be responsible for repair of damage to any adjacent structures, and any curbing, sidewalk, or asphalt damaged during the project. 6. Should unacceptable material such as muck, building debris or other unsuitable material be discovered, Contractor shall notify the City of Bishopville before proceeding with work. Borrow material shall be required to meet the SCDOT standard specifications for roadways and structures. Placement and compaction will be directed by the City of Bishopville
Bid Results
Residential Subdivision
$70,700.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2022
August 29, 2022
To Be Determined, Bishopville, SC
Related To This Project
Bishopville, SC
Bid Date: Sep 20 2022
Bishopville, SC
--
Bishopville, SC
--
Bishopville, SC
Bid Date: Mar 09 2023
Bishopville, SC
Bid Date: Feb 21 2023
Bishopville, SC
--
Bishopville, SC
Bid Date: Apr 11 2023
Bishopville, SC
Bid Date: Apr 06 2023
Bishopville, SC
Bid Date: Aug 19 2022
Bishopville, SC
Bid Date: Jun 30 2022
Bishopville, SC
Bid Date: Oct 10 2024
Bishopville, SC
--
Bishopville, SC
Bid Date: Jun 14 2022
Bishopville, SC
Bid Date: Jun 21 2022
Bishopville, SC
Bid Date: May 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.