BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a mixed-use development in Bishopville, South Carolina. Completed plans call for the demolition of a residential development; for site work for a residential development; for asbestos abatement for a residential development; water / sewer project; water / sewer project; and water / sewer project.

**As of September 20, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** Bishopville will accept separate sealed bids for the complete demolition and disposal of Twenty-Three (23) residential structures that CONTAIN ASBESTOS, within the city of Bishopville. This project is being funded in whole/in part by the Community Development Block Grant Program. All federal CDBG requirements will apply to the contract. The CDBG Special Contract Provisions will apply. All contractors are required to be registered in the federal System for Award Management. Project Location: Bishopville, South Carolina 1. The contractor will be responsible for demolition, removal, and proper disposal of structures and contents of existing vacant residential buildings. The list of structures to be demolished is included as AttachmentA. 2. The contractor will be responsible for all costs of transport and proper disposal of demolition debris, both Asbestos Containing material and non-Asbestos Containing material. 3. The Contractor will provide a complete compliance history and documentation of site procedures in relation to the abatement and disposal of asbestos and nonasbestos containing materials. 4. The contractor will be responsible for all landfill fees for asbestos containing material. Landfill tickets must be submitted with all invoices in order for payment to be processed. Landfill tickets must clearly show the address and Parcel Number. Demolition for properties must be completed, no partial payment request will be accepted. 5. The contractor will be responsible for obtaining all certifications and permits necessary for the completion of the project from the applicable regulatory agencies. 6. The contractor will be responsible for demolition of all slabs and all underground structures to a depth of two feet below existing finish floor grade. Approved material shall be placed as backfill in all excavated areas and graded to the elevation necessary to provide positive surface drainage to all areas of the site. 7. The contractor is responsible for removing all debris and trash from the entire lot, and the entire lot is to be left in a clean, properly graded, seeded state. Exception for those lots that have multiple units. In this case the area with the unit to be demolished will be cleared according to the discretion of the City of Bishopville. 8. The contractor is responsible for removing all slabs, walkways, driveways, fences, and accessory buildings. 9. The contractor is responsible for all temporary facilities necessary to successfully complete the project to include, but not limited to, portable restrooms, temporary power, temporary water, silt fencing, site security, etc. 10. Caution and care must be exercised to prevent damage to adjacent structures, and to ensure that existing businesses can operate normally without significant disruption during demolition activities. 11. Caution and care must be taken to ensure mature trees are not removed or damaged. 12. The Contractor must comply with SCDHEC Regulation 61-86.1 - "Standards of Performance for Asbestos Projects". 13. All required Air Monitoring during asbestos abatement has been contracted separately and is not the responsibility of the contractor retained under this RFB Clearings Backfill and Compilation Page 3 of 6 1. The contractor shall secure any necessary permits from local agencies and submit notifications to the Health Hazards Control Branch, as applicable, to include a Demolition Permit, any required Tree Permit and a Business License, as applicable. 2. For installation of sediment and erosion control devices, practices, and structures, per current SCDHEC and SCDOT standards. 3. Depressions greater than six inches created by the demolition and removal of items specified must be graded level with adjacent land, as directed by the City of Bishopville. All areas where items specified have been demolished and/or removed, will be seeded as directed by the City of Bishopville. 4. Upon completion of the assigned work, the contractor will provide written verification that all structures have been removed 1. Bringing site to proper grade shall be part of the base bid. Contractor shall bring finished grade to match the sidewalks or to existing materials on all sides of the site. Contractor shall slope finish grade to drain. 2. It is expected that the Contractor will backfill all excavated areas with suitable material, and grade the area to provide for positive surface drainage for the entire site (generally, 0.5% minimum slope from the highest point of adjacent road, curb or sidewalk) 3. Fill shall be for counties classified as Group B per SCDOT standard, section 203.2....1.8, #15. The following soil types are acceptable for use as backfill material in accordance with AASHTO M 145. They are as follows: A-l, A-2, A-3, A4, and A-5. Each layer shall be spread evenly and compacted. Each layer of backfill and the top eight inches of material shall be compacted by approved equipment and the density shall be 98% as determined by the Standard Proctor Test. 4. The Contractor will be responsible for re-seeding the site with appropriate seasonal grass for erosion control, as directed by the City of Bishopville. 5. The Contractor will be responsible for installation of silt fence at the edge of curb or sidewalk to prevent sediment runoff. The Contractor will be responsible for repair of damage to any adjacent structures, and any curbing, sidewalk, or asphalt damaged during the project. 6. Should unacceptable material such as muck, building debris or other unsuitable material be discovered, Contractor shall notify the City of Bishopville before proceeding with work. Borrow material shall be required to meet the SCDOT standard specifications for roadways and structures. Placement and compaction will be directed by the City of Bishopville

Bid Results

Residential Subdivision

$70,700.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
125
Bidding Soon
1,497
All Active Projects
652
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 28, 2022

August 29, 2022

March 12, 2023

img_map_placeholder

To Be Determined, Bishopville, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.