Site work and paving for a mixed-use development in Billings, Montana. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.
** As of 03/17/2023, This project has not yet been awarded for construction and is pending some value engineering. The work generally consists of descriptions below: 1. Scope - Parking lot reconstruction, storm sewer construction, and roof gutter/downspout alterations. Improvements will include: Furnish and install storm sewer system per construction plans Furnish and install roof gutters, downspouts, and horizontal & vertical roof leaders per construction plans Remove existing pavement, scarify/re-compact subgrade Furnish and Install base aggregate, geotextiles, asphalt paving, and concrete drainage pan (valley gutter) per construction plans Each bid or proposal must be accompanied by a certified check, cashier's check, or bid bond payable to the OWNER, in an amount not less than ten percent (10%) of the total amount of the bid. Successful bidders shall furnish an approved Performance Bond and a labor and materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful bidder(s) and a certificate(s) of that insurance shall be provided. The bid bond and a copy of the CONTRACTOR's license or certificate of renewal shall be included with each bid proposal. All bids must be sealed. Parking Lot Reconstruction: Construction shall have a flexible start date but shall be substantially complete and ready for OWNER's use and pre-final inspection within 60 calendar days from the Notice to Proceed. Substantial Completion shall be no later than October 27, 2023. All construction schedules shall be finally complete and ready for final payment within thirty (30) calendar days of Substantial Completion.
Award
Sidewalks / Parking Lot
$432,368.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2023
March 18, 2023
1 Pryor Gap Rd, Billings, MT
Related To This Project
Billings, MT
Bid Date: Aug 01 2022
Billings, MT
Bid Date: Aug 01 2023
Billings, MT
Bid Date: Aug 02 2022
Billings, MT
Bid Date: Aug 04 2022
Billings, MT
Bid Date: Sep 06 2022
Billings, MT
Bid Date: Mar 10 2021
Billings, MT
--
Billings, MT
--
Billings, MT
--
Billings, MT
--
Billings, MT
--
Billings, MT
Bid Date: Apr 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.