BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Huntington, West Virginia. Completed plans call for site work for a municipal facility.

As of July 28 , 2023 , this project has not yet been awarded. A timeline for award has not yet been established. The outside of the envelope shall be marked, "Bid - Clock Tower Scaffolding." Bids received after the stipulated time will not be accepted. The Cabell County Commission reserves the right to reject any and all bids in whole or in part, as their interests may require, and to waive any informality in bids received. Additionally, the Cabell County Commission reserves the right to accept or reject a Bid not accompanied by the required Bidding Documents; to accept or reject any condition of the Bid by the Bidder that is in any way inconsistent with the terms and conditions of the Bidding Documents; or to accept or reject a Bid that is in any way incomplete or irregular. All Bids shall be valid for sixty (60) days from the date of opening. A. Scaffolding is limited to that portion of the Cabell County Courthouse referred to as its "Clock Tower" which measures approximately 26 feet square at its base and 75 feet +/- high from the Courthouse main roof level (Clock Tower base) to the cupola. B. Include engineering analysis of the existing roof structure surrounding the Clock Tower for the purpose of determining the design of scaffolding bearing components such that the loads imposed on the roof by the scaffolding will not damage the existing roofing or roof structure for the duration of the Project. Existing building structural drawings are not available as they were lost or destroyed in years past. 1. Membrane roofing shall be protected from damage for the duration of the Project. 2. Scaffolding shall span across and not bear upon the existing gable-shape standing seam copper roof that is on the north side of the Clock Tower base. 3. Scaffolding shall not come in contact with nor bear any weight upon: a. The 4 smaller gold-leaf finished half domes. b. The gold-leaf finished high, main dome. 4. Scaffolding shall permit access to all levels of the Clock Tower both for inspection and for rehabilitation work.

Award

Municipal

$140,000.00

Public - County

Site Work

10

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
437
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2023

June 12, 2023

img_map_placeholder

750 5th Ave, Huntington, WV


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.