BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Brielle, New Jersey. Completed plans call for the renovation of a water / sewer project.

Work includes the furnishing of all labor, materials and equipment necessary to complete rehabilitation of the Authority's existing Glimmer Glass and Brielle Pump Stations, as shown on the Drawings and as described in the Specifications. The work for these two (2) pump stations shall include, but in no way limited to, provision and implementation of bypass pumping system; shutdown and isolation of existing sewage pumps wet wells; demolition of existing concrete diversion walls, floors and flow channels within wet wells; and installation of new FRP grating levels as well as the installation of stainless steel or concrete structural support systems all as noted on the Contract Drawings. Additional work shall include cleaning and repairing of all interior concrete surfaces within each wet well; cleaning and rehabilitation and coating of metal surfaces to remain in each wet well; installation of epoxy coating system on all existing wet well surfaces; installing new stainless steel trash basket with associated mounting and railing requirements; installation of both davit crane hoists and fall protection/retrieval hoists; and installation of flood protection measures, as shown on the drawings and specified herein. In addition to the work described above, work uniquely designated at the Brielle Pump Station shall include installation of new aluminum flow channel within wet well; cutting of existing wet well top slab with installation of new fall safe hatch access; construction of architectural and facade improvements to the existing building; and installation of a 6-foot vinyl fence around the pump station site. The work shall be completed within 365-days of notice to proceed. However, it shall be specifically understood that the actual construction time frame where Contractors will be permitted to bypass sewage at the Contract pump stations will be limited to between September 8, 2022 and May 24, 2023 Bid Result : ITEM No 1 Base Bid Work for Brielle Pump Station Complete & Operational - MBE Mark III ELE - $390,000.00 ITEM No 2 Base BidWork for Glimmer Glass Pump Station Complete & Operational- Quad Construction Co - $414,760.00

Award

Water / Sewer

$390,000.00

Public - County

Renovation

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
435
Active Projects
159
Bidding Soon
3,995
All Active Projects
1,719
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

September 8, 2022

img_map_placeholder

Multiple Locations, Brielle, NJ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.