BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Congress, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; and water / sewer project.

**As of April 26, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Tracs No: 093 YV 198 F0031 01C Project No: 093-B(215)S Termini: Kingman - Wickenburg Highway (Us 93) Location: Us 93, Tegner Road to Sr 89a Route No. Milepost District Item No. US 93 193.13 to 198.35 Northwest 8373 The amount programmed for this contract is $ 54,950,000. The location and description of the proposed work are as follows: The proposed project is located on US 93 Highway, starting at MP 193.13 and proceeding in the southeasterly direction ending at MP 198.35. The project straddles a county line, with about 30% in Maricopa County and 70% in Yavapai County. The proposed work consists of upgrading a 2-lane roadway to a new 4-lane divided facility with roundabouts. Project also includes, frontage roads, drainage systems, lighting, signing and striping, landscaping and erosion control, traffic control and other related work. The time allowed for the completion of the work included in this contract will be 390 working days. The Arizona Department of Transportation, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252.42 U.s.c. 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 7.52. This Contract Is Subject to the Provisions of Arizona Revised Statutes Section 42-5075 -- Prime Contracting Classification; Exemptions; Definitions. No Award Will Be Made to Any Contractor Who Is Not a Duly Licensed Contractor in Accordance with Arizona Revised Statutes 32-1101 Through 32-1170.03. All Labor Employed on This Project Shall Be Paid in Accordance with the Minimum Wage Rates Shown in the General Wage Decision. These Rates Have Been Determined in Accordance with the Requirements of the Law and Issued by the Secretary of Labor for This Project. The Wage Scale Is on File in Contracts and Specifications Section and Copies May Be Obtained at All Reasonable Times. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only from Corporate Sureties Authorized to Do Business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.E. Group Manager Contracts & Specification AZDOT - Kingman - Wickenburg Highway (Tegner St - Wickenburg Ranch W)

Bid Results

Roads / Highways

$50,966,991.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

734

7

27

17

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
676
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2022

February 14, 2023

img_map_placeholder

US-93, Congress, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.