BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Surry, Virginia. Completed plans call for the renovation of a playground / park / athletic field.

As of September 14, 2022, this project was awarded to ABR Mechanical Services LLC, but awarded amount is not available. I. PURPOSE AND BACKGROUND: The purpose of this Invitation for Bids (IFB) is to engage a contractor to remove and dispose of four (4) HVAC units which are past their useful life and to furnish and install four (4) new and unused HVAC units according to the solicitation documents. Chippokes Plantation State Park is located in a rural, agricultural area off the James River and Route 10 in Surry County. One of America's oldest State Parks, Chippokes offers a restored mansion, farm museum, picnic shelters and various trails. II. SCOPE OF WORK: The Contractor shall furnish all materials, labor, equipment and supervision to remove and replace existing HVAC systems with like and kind. All materials and installation work shall comply with these specifications, and conform to the Virginia OSHA Standard, and the Virginia Uniform Statewide Building Codes. Work is to be completed Monday-Friday and coordinated with the Park Manager. A. GENERAL REQUIREMENTS: 1. Product information shall be submitted with quote for evaluation. Failure to provide Product Information may eliminate your bid from evaluation. * 2. The contractor shall remove existing HVAC equipment from the premises and dispose of all components and debris according to all Commonwealth of Virginia Laws and Regulations. No material shall be disposed of on site. 3. The Contractor shall install and render operational four (4), 16 SEER or higher, outdoor compressor units and matching air handlers as identified by the tonnage on the site visit. o The Contractor shall install and render operational those identified in whole ton units, minimum 16 SEER, two-stage outdoor compressor units for those that will replace identified 2 ton or 3 ton units with matching multiple speed air handlers to meet or exceed the Air Conditioning and Refrigeration Institute (AHRI) Standard 210/240. o The Contractor shall install and render operational those units identified in half ton units, minimum 16 SEER with single stage outdoor compressor units for those that will replace identified 1.5, 2.5 or 3.5 ton units with matching air handlers to meet or exceed the Air Conditioning and Refrigeration Institute (AHRI) Standard 210/240. 4. The Contractor shall include new refrigerant lines (line sets), equipment pad (fiberglass), new snow legs if installed on the existing unit, condensate drip pan and piping outside the building foundation, adapters to old duct work, emergency/auxiliary heat strips appropriate for the area to be heated, and programmable thermostat. 5. Existing electrical connections/disconnects may be used if they meet manufacturer recommendations. If not, electrical components must be replaced. 6. The Contractor is responsible for any carpentry needed to enlarge access openings, including trim and finishing to match existing woodwork. 7. The Contractor install new/unused supply and return transitions. 8. The Contractor shall install new condensate pump on unit if one is currently installed. 9. The Contractor shall provide and install emergency/auxiliary heat strips that are appropriate for the size of the unit and the space to be heated. 10. The Contractor shall provide and install UV Air Scrubbers for each unit that are appropriate for the size of the unit and in accordance with the HVAC manufacturer's requirements. 11. The Contractor shall remove the existing units from the premises and dispose of them in accordance with all local and national standards. All refrigerant shall be handled in an environmentally responsible manner in accordance with the Clean Air Act. 12. The Contractor shall perform a full-system start up and review of the installation with Park staff, including an overview of the operation and maintenance of the new system, as well as installed accessories. 13. The Contractor shall provide Owner's manuals for each piece of equipment installed during this project. 14. The Contractor shall provide unit and workmanship warranty information with their bid submission. Unit must carry a minimum 5-year warranty on parts and 1-year warranty on labor. 15. The contractor shall provide the business name, contact name, phone number and address of an authorized service repair vendor that will honor all warranty work and repairs on the product they (the bidder) offer in the same day or minimum 24 hour response time (including weekends). Bidders may be requested to provide sub-contractors' names in the event that your company is more than one hour from the installation location.

Award

Playgrounds / Parks / Athletic Fields

$180,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
77
Bidding Soon
1,442
All Active Projects
637
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 5, 2022

September 5, 2022

October 9, 2022

img_map_placeholder

695 Chippokes Park Rd, Surry, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.