BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an industrial development in Stevens Point, Wisconsin. Completed plans call for the construction of a 47,000-square-foot, one-story above grade industrial development; and for site work for a industrial development.

The project includes a single story 47,000 square-foot new construction of an advanced manufacturing, engineering technology, and apprenticeship building, consisting of structural steel, bar joists, and membrane roof. Sitework will include all new entrance roads, landscaping, and site lighting. The exterior of the building will be metal panel, masonry, and glazed storefront. Work will commence on or about March 1, 2023 and shall be completed by May 31, 2024. J.H. Findorff & Son Inc. will be the Construction Manager as Advisor. Project Location: 5000 Coye Drive, Stevens Point, Wisconsin, 54481 The Owner became aware of a regulatory matter with the previous bid process. In order to ensure compliance, the project is being rebid. The drawings and specifications have been updated to include previous addendums and subsequent updates and dated November 29, 2022. Each Bid shall be accompanied by bid security in the sum of five percent (5%) of the total bid amount. The required security must be in the form of a bid bond issued by a surety licensed to conduct business in the State of Wisconsin and named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Department. The Surety Company must have an AM Best rating of A- or better. Bond will serve as a guarantee that if the bid is accepted, the bidder will execute the agreement and provide a Performance and Labor and Material Payment Bond. Bid Securities of all bidders except the three (3) lowest bidders will be returned within ten (10) days after the bid opening. Bid securities will be returned to remaining bidders after execution of the agreement. Bid securities will be forfeited to the owner as liquidated damages if the bidder fails to execute and return Agreement and Bonds to owner within ten (10) days from receipt of agreement for signature. The Owner reserves the right to reject any or all bids, when, in the opinion of the Owner, such action serves the best interest of the Owner. All Bids shall be identified and clearly marked. Bids will be received for individual trade packages. It is required to use the bid form included in the packet. . Email bid form submission (file size not to exceed 35MB) is completed by emailing the bid form to: purchasing@mstc.edu . In-person or US mail submissions must be delivered to: Craig Wagner - Purchasing Mid-State Technical College 1001 Centerpoint Drive Stevens Point, WI 54481 Bids may be held by the Owner for a period not to exceed sixty (60) days from the date above for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding contracts. No bid may be withdrawn during this period without written consent of the Owner. Submit RFI's as noted in the Invitation created by Mid-State Technical College. Submit Requests for Information (RFI) by 10:00am on December 8, 2022, to the aforementioned individual. Work will commence on or about March 1, 2023 and shall be completed by May 31, 2024.

Post-Bid

Industrial

$30,000,000.00

Public - State/Provincial

New Construction, Site Work

105

27

15

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
23
Bidding Soon
252
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

March 1, 2023

img_map_placeholder

5000 Coye Dr, Stevens Point, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.