Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Council Bluffs, Iowa. Completed plans call for site work for a playground / park / athletic field; water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.
1 LS Demolition Work - includes removal of trees, brush, vegetation, trash, rubbish, fence, sidewalks, curb and gutter, paving and driveways from the site. Disconnection of utilities; furnishing and compaction of backfill material, furnishing and placing of topsoil; finish grading of disturbed areas; placing and removing safety fencing; seeding; and payment of any permit or disposal fees. 1 LS Dry Storage Building Pad and Footings: the cost of constructing the concrete pad, footings, rebar, and joints for the future dry storage building and any other associated work for proper construction. 4110.00 LF Linear Storm Sewer Trench Drain. Price includes, but is not limited to, furnishing and installing the linear trench drain including all appurtenances; furnishing and placement of PCC transition; furnishing, excavation, and backfill of discharge pipe; connection to manhole or intake, if required; installation of apron, if required. 176.00 SY 5" Concrete Paving: Walk paving, subgrade preparation and excavation. Square Yard price includes excavation, subgrade preparation, grading, formwork, construction of paving. This item also includes sampling, testing for slope and smoothness, installing expansion joints, applying curing compound, jointing and any other necessary work for proper construction. 523.00 SY 6" Concrete Paving: Trail, and storage bin paving, subgrade preparation and excavation. Square Yard price includes excavation, subgrade preparation, grading, formwork, construction of paving. This item also includes sampling, testing for slope and smoothness, installing expansion joints, applying curing compound, jointing and any other necessary work for proper construction. 1,440.00 SY 8" Concrete Paving: Turnaround drive and maintenance yard paving. Square Yard price includes excavation, subgrade preparation, grading, formwork, construction of paving. This item also includes sampling, testing for slope and smoothness, installing expansion joints, applying curing compound, jointing and any other necessary work for proper construction. 503.00 LF Chain Link Fencing: Unit price shall include but not limited to fence materials, posts, rails, braces, infill fabric, fittings, excavation of post holes, concrete encasement of posts and all appurtenances necessary for proper installation of the new fence. 1 EA 18' Automatic Sliding Chain Link Gate. Unit price includes fabrication, freight, and installation of new automatic sliding gate with card activation. Work shall include but is not limited to gate materials, posts, rails, braces, infill fabric, fittings, excavation of post holes, concrete encasement of posts, electric wiring for card activation of gate, and all appurtenances necessary for proper installation of the new gate. 55 LF 5' Masonry Walls: Unit price shall include but is not limited to wall materials, excavation and installation of footings and all appurtenances necessary for proper installation of the new walls. 71 LF 8' Masonry Walls: Unit price shall include but is not limited to wall materials, excavation and installation of footings and all appurtenances necessary for proper installation of the new walls. Each proposal shall be accompanied by a certified check, bid bond by a surety company registered to do business in the State of Iowa, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States in the amount of ten percent (10%) of the total bid price and made payable to the City of Council Bluffs. A copy of the certified check, bid bond, or share draft is to be uploaded in the assigned requested attachments area. If a company who has a check is awarded the bid, the City will request the physical check at that time. The certified check or share draft will be returned to the successful bidder once the agreement has been executed. Letters of credit and company or personal checks are not acceptable substitutes for a bid bond and will be cause for rejection of bid. The successful bidder will be required to furnish satisfactory performance and payment bonds in the amount of one-hundred percent (100%) of the total bid price, a certificate of insurance and a certificate of equal employment opportunity and comply with minimum wage provisions as established by the U.S. Department of Labor. The work under the proposed contract shall be completed as detailed in the Instructions to Bidders. All work is to be completed on or before June 2, 2025. If possible and achievable by the Contractor, the City of Council Bluffs desires the project to be completed by December 31, 2024, but allows the project to be completed by June 2, 2025, to allow for additional project flexibility. Question Deadline 09/24/2024 at 5:00 PM CT Question Deadline The City of Council Bluffs reserves the right to reject or accept any or all bids and waive any irregularities in the interest of the City.
Award
Playgrounds / Parks / Athletic Fields
$493,274.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2024
October 31, 2024
2900 Richard Downing Ave, Council Bluffs, IA
Related To This Project
Council Bluffs, IA
--
Council Bluffs, IA
Bid Date: Nov 10 2022
Council Bluffs, IA
Bid Date: Nov 10 2022
Council Bluffs, IA
Bid Date: Sep 20 2022
Council Bluffs, IA
Bid Date: Sep 29 2022
Council Bluffs, IA
Bid Date: Oct 13 2022
Council Bluffs, IA
Bid Date: Oct 24 2022
Pottawattamie County Road Operations Center (ROC) Vehicle Maintenance and Office Buildings - 4579116
Council Bluffs, IA
Bid Date: Sep 20 2022
Council Bluffs, IA
Bid Date: Jun 11 2024
Council Bluffs, IA
Bid Date: Nov 30 2022
Council Bluffs, IA
Bid Date: Oct 19 2022
Council Bluffs, IA
Bid Date: Nov 30 2022
Ames, IA
Bid Date: Oct 18 2022
Sioux City, IA
Bid Date: Nov 12 2024
Council Bluffs, IA
Bid Date: Jun 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.