Site work and paving for a mixed-use development in Council Bluffs, Iowa. Completed plans call for site work for a playground / park / athletic field; water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

1 LS Demolition Work - includes removal of trees, brush, vegetation, trash, rubbish, fence, sidewalks, curb and gutter, paving and driveways from the site. Disconnection of utilities; furnishing and compaction of backfill material, furnishing and placing of topsoil; finish grading of disturbed areas; placing and removing safety fencing; seeding; and payment of any permit or disposal fees. 1 LS Dry Storage Building Pad and Footings: the cost of constructing the concrete pad, footings, rebar, and joints for the future dry storage building and any other associated work for proper construction. 4110.00 LF Linear Storm Sewer Trench Drain. Price includes, but is not limited to, furnishing and installing the linear trench drain including all appurtenances; furnishing and placement of PCC transition; furnishing, excavation, and backfill of discharge pipe; connection to manhole or intake, if required; installation of apron, if required. 176.00 SY 5" Concrete Paving: Walk paving, subgrade preparation and excavation. Square Yard price includes excavation, subgrade preparation, grading, formwork, construction of paving. This item also includes sampling, testing for slope and smoothness, installing expansion joints, applying curing compound, jointing and any other necessary work for proper construction. 523.00 SY 6" Concrete Paving: Trail, and storage bin paving, subgrade preparation and excavation. Square Yard price includes excavation, subgrade preparation, grading, formwork, construction of paving. This item also includes sampling, testing for slope and smoothness, installing expansion joints, applying curing compound, jointing and any other necessary work for proper construction. 1,440.00 SY 8" Concrete Paving: Turnaround drive and maintenance yard paving. Square Yard price includes excavation, subgrade preparation, grading, formwork, construction of paving. This item also includes sampling, testing for slope and smoothness, installing expansion joints, applying curing compound, jointing and any other necessary work for proper construction. 503.00 LF Chain Link Fencing: Unit price shall include but not limited to fence materials, posts, rails, braces, infill fabric, fittings, excavation of post holes, concrete encasement of posts and all appurtenances necessary for proper installation of the new fence. 1 EA 18' Automatic Sliding Chain Link Gate. Unit price includes fabrication, freight, and installation of new automatic sliding gate with card activation. Work shall include but is not limited to gate materials, posts, rails, braces, infill fabric, fittings, excavation of post holes, concrete encasement of posts, electric wiring for card activation of gate, and all appurtenances necessary for proper installation of the new gate. 55 LF 5' Masonry Walls: Unit price shall include but is not limited to wall materials, excavation and installation of footings and all appurtenances necessary for proper installation of the new walls. 71 LF 8' Masonry Walls: Unit price shall include but is not limited to wall materials, excavation and installation of footings and all appurtenances necessary for proper installation of the new walls. Each proposal shall be accompanied by a certified check, bid bond by a surety company registered to do business in the State of Iowa, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States in the amount of ten percent (10%) of the total bid price and made payable to the City of Council Bluffs. A copy of the certified check, bid bond, or share draft is to be uploaded in the assigned requested attachments area. If a company who has a check is awarded the bid, the City will request the physical check at that time. The certified check or share draft will be returned to the successful bidder once the agreement has been executed. Letters of credit and company or personal checks are not acceptable substitutes for a bid bond and will be cause for rejection of bid. The successful bidder will be required to furnish satisfactory performance and payment bonds in the amount of one-hundred percent (100%) of the total bid price, a certificate of insurance and a certificate of equal employment opportunity and comply with minimum wage provisions as established by the U.S. Department of Labor. The work under the proposed contract shall be completed as detailed in the Instructions to Bidders. All work is to be completed on or before June 2, 2025. If possible and achievable by the Contractor, the City of Council Bluffs desires the project to be completed by December 31, 2024, but allows the project to be completed by June 2, 2025, to allow for additional project flexibility. Question Deadline 09/24/2024 at 5:00 PM CT Question Deadline The City of Council Bluffs reserves the right to reject or accept any or all bids and waive any irregularities in the interest of the City.

Award

Playgrounds / Parks / Athletic Fields

$493,274.00

Public - City

Paving, Site Work

14

14

8

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
41
Bidding Soon
472
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

October 31, 2024

img_map_placeholder

2900 Richard Downing Ave, Council Bluffs, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.