Site work for a mixed-use development in Lenoir, North Carolina. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.
As of August 10, 2022, project was awarded to RES Environmental Operating Company, LLC, awarded amount is $127,200.72. The gully is to be restored with natural channel design of approximately 150 linear ft. and the exposed 4 in. PVC sewer line is to be buried under an armored berm. The contractor will be responsible for all excavation and aggregate hauling associated with the project. Two silt fences, a sedimentation basin, and a construction entrance will be installed, and repaired as necessary, by the contractor before excavation begins. Soil fill will be placed in 8 to 12 in. lifts and compacted to a minimum of 85% STP. Every other lift will be tested by a licensed geotechnical engineer and shall identify berm materials, reference maximum density, and optimum moisture content at the time of compaction. Grade control structures (cascades, steps, and riffles) will be lined with 0.25 ft. gravel bedding (#57 stone) atop a non-woven geotextile. Efforts will be taken by the contractor to properly anchor the geotextile into trenches. Boulders will be double layered and placed according to detail. Footer and tie out boulders will be properly buried into the soil. At final grade, the contractor will place and till excess organic cut as topsoil in a minimum of 1 in. thickness. Erosion control matting will be pinned and staked in place with wooden pegs on berms and pool banks and live stakes in pool banks only. Effort shall be made for the existing native trees and vegetation that do not conflict with grading be kept and protected. The boulder and cobble grade control structures will sit atop not only a 0.25 ft. layer of #57 stone but also a 4 ft. wide by 3.5 ft. deep filter media (ASTM C33 Sand) channel. The depth of filter media in the channel will vary from 1 ft. below berms to 2.5 ft. below pools. Soil lined with a non-woven geotextile will be placed above the 1 ft. deep sand to form berms. An additional 1.5 ft. of sand will be placed in the pools between berms. A 0.25 ft. gravel layer will be placed on top of the sand in the pools and on the geotextile lined soil berms. Cobbles will be placed on top of the gravel on the upstream facing berm surface, otherwise known as the glide. Boulders will be placed on top of the gravel on the steeper downstream facing berm surfaces, known as cascades, and cobbles will be placed on top of the flatter downstream facing berm surfaces, known as riffles. Questions concerning the RFP requirements must be submitted in writing via email to kgshelto@ncsu.edu, Subject Line: RFP #63-KGS862737 - Questions, no later than 5:00 P.M. on Wednesday, July 6, 2022. Questions will be answered in the form of an addendum to this RFP In case of default by the Contractor, the University may procure the services from other sources and hold the Contractor responsible for any excess cost occasioned thereby. The University reserves the right to require performance bond or other acceptable alternative guarantees from successful offeror without expense to the University. Offerors are cautioned that this is a request for offers, not a request to contract and the University/State reserves the unqualified right to reject any and all offers when such rejection is deemed to be in the best interest of the University or State.
Award
Water / Sewer
$127,201.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2022
August 15, 2022
509 Ridge St NW, Lenoir, NC
Related To This Project
Lenoir, NC
Bid Date: Dec 16 2021
Lenoir, NC
Bid Date: Aug 26 2022
Lenoir, NC
--
Lenoir, NC
Bid Date: Oct 03 2019
Lenoir, NC
Bid Date: Feb 16 2023
Lenoir, NC
Bid Date: Mar 24 2023
Lenoir, NC
Bid Date: Mar 02 2023
Lenoir, NC
Bid Date: Jul 12 2022
Lenoir, NC
Bid Date: Jun 29 2021
Lenoir, NC
Bid Date: May 31 2022
Lenoir, NC
Bid Date: Mar 03 2022
Lenoir, NC
Bid Date: Feb 01 2022
Lenoir, NC
Bid Date: Nov 08 2022
Lenoir, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.