EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 2, 2024 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Malibu, California. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

SCOPE OF WORK : In general, the proposed improvements consist of median modifications for approximately 1 mile on Pacific Coast Highway between John Tyler Drive and Puerco Canyon Road. The improvements include modifying the existing curbed median by installing stamped concrete, roadway excavation, asphalt pavement, striping and signage, pavement markers, pavement markers and thermoplastic striping removal, new storm drain system, storm drain removal, adjusting utility covers, potholing, temporary traffic control, and all other appurtenant work included and shown in the Contract Documents and Specifications. The wage rate for any classification not listed by the California Department of Industrial Relations, but which may be required to execute the proposed contract, shall be in accord with specified rates for similar or comparable classifications or for those performing similar or comparable duties, within the agency's determinations. The bid shall be submitted, and the work shall be performed by a Class "A" State of California licensed contractor in strict conformance with the project specifications for PACIFIC COAST HIGHWAY MEDIAN IMPROVEMENTS PROJECT - JOHN TYLER DRIVE TO PUERCO CANYON ROAD Specification No. 2049 now on file in the City's Public Works Department. The City reserves the right to retain all bids for a period of 90 days after the bid opening date for examination and comparison and to delete any portion of the work from the Contract. The City reserves the right to delete any bid item to the extent that the bid is qualified by specific limitation. An unbalanced bid shall be considered as grounds for rejecting the entire bid. The City reserves the right to determine and waive non-substantial irregularities in any bid, and to reject any or all bids. The City reserves the right to determine and waive non-substantial irregularities in any bid, and to reject any or all bids.

Award

Roads / Highways

$1,362,986.00

Public - City

Paving, Site Work

120

10

2

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Painting and Coating
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Mobile Plant Equipment, General Vehicles, Bicycles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
71
Bidding Soon
1,833
All Active Projects
760
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

January 29, 2024

img_map_placeholder

Multiple Locations, Malibu, CA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Pacific Coast Highway Median Improvements Project - John Tyler Drive To Puerco Canyon Road

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.