Site work, paving and new construction of a mixed-use development in Johnson City, Tennessee. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; road / highway; and road / highway.

The project consists of the phased construction of a three sided precast culvert (36ft span x 8ft rise x 70 ft long), construction of the foundation for the culvert, the construction of the wing walls for the culvert, the backfill for the culvert, 30” headwall, riprap, grading, and other associated items of work. Work will include grading to prepare for the culvert, placing and compacting base stone, and seeding with mulch for grassed areas disturbed around the work area, and other associated activities. Construction will happen in phases, while traffic is on the existing bridge, part of the proposed bridge will be constructed. Once the first phase is complete and backfilled, the city shall place asphalt, curb and gutter, sidewalk, and temporary traffic control required to route traffic onto the new bridge. Once traffic has been moved to the segment of the new bridge, the old bridge shall be removed, and the remaining new bridge constructed. Each bid shall be accompanied by a certified check or bid bond in the amount equal to five percent (5%) of the amount bid. This bid bond is required as a guarantee that, if the bid is accepted, a contract will be entered into and the performance thereof duly secured by an approved performance bond. The successful bidder will be required to furnish an acceptable Performance Bond and a Payment Bond in the amount of one hundred percent (100%) of the contract price, each bond. Surety companies executing Bonds must appear on the Treasury Department's most current list (circular 570) as amended and be authorized to transact business in the State of Tennessee. The project herein described is to be completed within 150 calendar days from the date of the Notice To Proceed, excluding a period of time needed by the city to perform work during the contract which would require the remobilization of the Contractor. Liquidated damages for delay of completion of contract will be assessed at $500.00 per day in accordance with the Agreement (Contract).

Award

Bridges / Tunnels

$1,788,126.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
65
Bidding Soon
1,051
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.