BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Bernardino, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of August 25th, 2022, project has not been awarded. No timeline of award was established. This construction project is located at the Interstate 10 (I-10) Cedar Avenue interchange from PM 17.8 to 19.3. The improvements include widening the existing Cedar Avenue overcrossing (OC) from 6 to 10 lanes, replacing the Union Pacific Railroad overhead (OH), widening Cedar Avenue from 4 to 6 through lanes, and realigning and/or widening the interchange entrance and exit ramps. On Cedar Avenue, the project limits extend from Bloomington Avenue on the north to Slover Avenue on the south. The I-10 Cedar Avenue Improvements Project in the County of San Bernardino, California District 8, Interstate 10 consists of, but is not limited to, the following components: A. Widen Cedar Avenue between Bloomington Avenue and Orange Street from 4 to 6 through lanes; adding right turn lanes and vehicle storage for left turn lanes into the interchange entrance ramps; and adding bike lanes or shoulders on Cedar Avenue. B. The eastbound exit ramp will be widened from 2 to 3 lanes; and the westbound exit ramp will be widened from 2 to 4 lanes at the ramp termini respectively. C. Widen the I-10/Cedar OC to the east of the existing OC structure from 6 to 10 lanes. D. Replace the existing 3-span Cedar/Railroad OH with a single-span structure over the railroad. The new OH will be wider (to the east of existing OH structure) and slightly elevated to accommodate the deeper OH structure. E. Construct retaining walls along the eastbound exit ramp, eastbound entrance ramp and westbound exit ramp. F. Construct retaining walls between Cedar Avenue and Cedar Place at the southwest quadrant of the interchange, and between Cedar Avenue and alley at the northeast quadrant of the interchange. G. Construct 2 sound walls near the westbound ramps. H. Replace a segment of the existing concrete channel with reinforced box culvert. I. Modify or construct drainage system improvements at various locations. J. Provide stormwater treatment features to treat runoff from pavement surfaces. K. Modify or add traffic signals and ramp metering systems. L. Construct Water Valley Water District water pipes and improvements. M. Coordinate with other Utility companies for the relocation of their utilities, as needed, to accommodate the interchange improvements. N. Construct landscape with hardscape elements and plant materials. Online Q&A : Yes Q&A Deadline : 07/20/2022 4:00 PM (PDT) PN - 08-1A8304, 0800000579 All questions and or clarifications to this RFP, including questions that could not be specifically addressed at the Pre-Proposal Conference, must be put in writing and submitted electronically via Planet Bids, and they must be received by SBCTA no later than 4:00 p.m., on Thursday, July 14, 2022. Questions received after the date and time specified may or may not be responded to, at the sole discretion of SBCTA.

Bid Results

Roads / Highways

$74,146,595.00

Public - County

Paving, Site Work

1109

23

11

7

Subscribe For Documents

176 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
91
Bidding Soon
2,165
All Active Projects
972
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2022

October 17, 2022

img_map_placeholder

Multiple Locations, San Bernardino, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.