Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Pullman, Washington. Completed plans call for the renovation of a transportation facility.
The project value listed reflects the total project estimate. Hoffman Construction Company, General Contractor/Construction Manager ("GC/CM") for Terminal Relocation / Replacement Pullman-Moscow Regional Airport ("Project") being performed for Pullman-Moscow Regional Airport ("Owner") requests sub-bid proposals for Bid Package BP #3 - All Other Work (rebid of the following: Concrete, CMU, Finish Carpentry & Casework, Doors, Frames & Hardware furnish, Doors, Frames & Hardware install, Overhead Doors, Painting, Passenger Boarding Bridge and Ground Boarding, Window Coverings, Elevators, Fire Suppression, Landscaping and Synthetic Grass). A BID BOND in the form of a surety bond, cashier's check or certified check in an amount equal to five percent (5%) of the bid must be attached to bids in excess of three hundred thousand dollars ($300,000). BID BOND shall be payable to Hoffman Construction Company of Washington. Bond may be faxed providing the original Bid Bond is delivered no later than the next business day. Failure to provide BID BOND with bid shall render bid non-responsive. This is a prevailing wage project. Bidders must comply with requirements of the prevailing wage law in RCW Title 39 Public Contracts and Indebtedness and RCW Title 49 Labor Regulations. Workers must be paid not less than the Washington State Prevailing Wage Rates for Public Works Contracts in Whitman County dated February 25, 2021 and Davis Bacon prevailing wage law rates cited in the following decisions: Building: Davis-Bacon Act WD #: WA20220042, Highway: Davis-Bacon Act WD #: WA20220001, Heavy (including sewer and water): Davis-Bacon Act WD #: WA20220061. A copy of the applicable prevailing wage rates is available for viewing at Contractor's office. Subcontractor is subject to BOTH the State of Washington's Prevailing Wage Rate and Federal Davis-Bacon Act and shall pay workers the higher wage of the two rates. Owner and GC/CM are committed to promoting and stimulating the growth of minority business enterprises, women business enterprises and disadvantaged business enterprises (M/W/DBE) firms and maximizing the opportunities for state of Washington certified M/W/ESB firms to participate in the work of this project. The Pullman-Moscow Regional Airport Board has established a DBE contract goal for this contract. The Bidder/Offeror shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26, to subcontract 4.7% of the dollar value of the prime contract to certified DBE firms as defined in 49 CFR Part 26. All bidders shall submit the information required with their proposal on the forms provided in the RFP. Groundbreaking took place on July 6, 2022, with site work commencing. Construction of the structure will begin on July 28th, 2022.
Under Construction
Transportation Terminals
$49,000,000.00
Public - City
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2022
July 28, 2022
3200 Airport Rd, Pullman, WA
Related To This Project
Pullman, WA
Bid Date: Jan 08 2024
Pullman, WA
--
Pullman, WA
Bid Date: Aug 23 2022
Pullman, WA
Bid Date: Nov 14 2018
Pullman, WA
Bid Date: Aug 25 2022
Pullman, WA
Bid Date: Aug 31 2022
Pullman, WA
Bid Date: Sep 15 2022
Pullman, WA
Bid Date: Sep 16 2022
Pullman, WA
Bid Date: Jul 12 2022
Pullman, WA
--
Pullman, WA
--
Pullman, WA
Bid Date: Jun 10 2022
Pullman, WA
Bid Date: Jun 21 2022
Pullman, WA
--
Pullman, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.