BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fairview, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Work for Contract 2022-1 is generally described to include installation of approximately 8,864 lineal feet of 2- and 3-inch HDPE water main and appurtenances; reconnection of approximately 40 service lines, and restoration. A certified check or bank draft, payable to Palmer Shores Water Association, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to 10% of the total of the Bid shall be submitted with each Bid. The Contractor must abide by all laws and regulations applicable to USDA funded public contracts, including but not limited to equal employment opportunity. Pennsylvania prevailing wages will apply. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The de minimis and minor components waiver applies to this contract. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. Bids may be held by the Owner for a period not to exceed 60 days from the date of opening bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. Clarification Deadline: 7/18/2022 5:00 PM

Award

Water / Sewer

$296,357.00

Public - City

Site Work

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
51
Bidding Soon
1,007
All Active Projects
378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2022

August 22, 2022

img_map_placeholder

Multiple Locations, Fairview, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.