BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 5, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Saint George, South Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Dorchester County Public Works Department and the Dorchester County Sales Tax Transportation Authority (DCTA) is requesting technical proposals and qualifications from consulting firms interested in providing Right of Way Services for the proposed US 78 Phase 3A Infrastructure Improvements. The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$2,000,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
59
Bidding Soon
1,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2023

Project location map

US-78, Saint George, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.