BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Modesto, California. Contact the soliciting agency for additional information.

The Utilities Department, Wastewater Division is requesting contracting services to remove solar de-watered bio-solids from earthen non-lined drying beds located at the City's Sutter Treatment Plant (STP), then transporting the bio-solids to the City's Jennings Treatment Plant (JTP) for further processing including screening of plastic, hydration, rototilling and land application. The distance from STP to JTP is approximately seven (7) miles. Bio-solids are byproducts of the wastewater treatment removal process. Removal of the dried bio-solids provides renewed drying bed space for this revolving process. The bio-solids are solar dried in earth drying beds. Each summer City staff will determine which drying beds had dried sufficiently to be processed further. The dried bio-solids are removed from the drying beds and transported to JTP where they are screened, rototilled, hydrated and applied to City owned ranch fields as a soil amendment. Additionally, some beds contain the waste collected from our digester cleaning process which consists of digested sludge mixed with large amounts of sand and other insoluble debris. Plant Addresses: Sutter Treatment Plant 1221 Sutter Avenue Modesto, CA 95351 Jennings Treatment Plant 7007 Jennings Road Modesto, CA 95358 The term of the agreement shall be for a period of two (2) years, with three (3) one-year extension options at the sole discretion of the CITY, for a total of up to five (5) years. The payment of prevailing wages is required for maintenance under this agreement and all provisions of Section 7.04 of the General Provisions contained within the CITY standards shall apply. Project Type Bid Response Types Line Items Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A No An agreement shall be awarded to the bidder whose bid most closely satisfies the needs of the CITY and is deemed the most advantageous to the CITY. The CITY reserves the right to reject any or all bids or to waive any informalities or minor irregularities in a bid.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
93
Bidding Soon
1,769
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

September 9, 2022

img_map_placeholder

Multiple Locations, Modesto, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.