BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a bridge / tunnel in Wooster, Ohio. Working plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

All materials and equipment must meet the specifications of the Ohio Department of Transportation and shall include all necessary barricades, signs, lights, watchmen, etc., and work performed shall be under the supervision of the Wayne County Engineer s Office. ONLY ODOT PREQUALIFIED CONTRACTORS ARE ELIGIBLE TO SUBMIT BIDS FOR THIS PROJECT. All questions must be submitted in writing, via email, to the individual named above. Bidders are responsible for ensuring that all emails are sent and received. Bids must be submitted on the forms provided in the Invitation to Bid, all blanks of which must be accurately and appropriately completed. Bidders shall submit one (1) original and one (1) copy of their Bid Proposal in a sealed envelope that is clearly marked: BID FOR Honeytown Rd. Bridge: Design-Build Project. The outside of the sealed envelope shall also include the name and address of the bidder. If a bid proposal is submitted by mail, the sealed envelope containing the bid proposal must be enclosed in an outer envelope addressed to the Board and designated as a bid for the project. Due to the ongoing COVID-19 pandemic, bidders are asked to send a maximum of one (1) representative per bidder to the bid opening. The bid opening will also be available via Zoom. All bids must include a Bid Guaranty, as described in the Instructions to Bidders. Prevailing wage rates apply to this project. The Board maintains a website. This Legal Notice is posted on the Board's website and may be accessed at the following internet address. The Board reserves the right to reject any and all bids, to waive any and all irregularities and/or defects, and to accept the bid(s) deemed most beneficial to Wayne County. No bidder may withdraw a bid within sixty (60) days after the actual date of the bid opening.

Final Planning

Bridges / Tunnels

$711,353.00

Public - County

New Construction, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
146
Bidding Soon
2,571
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

December 2, 2022

Project location map

Honeytown Rd, Wooster, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.