BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a water / sewer project in Trois-Rivieres, Quebec. Completed plans call for site work for a water / sewer project; and for the demolition of a water / sewer project.

Reference number : 1737274 Electronically transmitted submission accepted: No Deadline for receiving complaints: 2024-03-19 Reconstruction of platform 17 and construction of new platform 16 - Construction work General description of the work for the Pier 17 reconstruction and new Pier 16 construction project: The Pier 17 reconstruction and new Pier 16 construction project is located in the central part of the port of Trois-Rivieres between Piers 19 and 13. It consists of reconstructing the seafront of Pier 17 (length +-242 m) which dates from the 1930s, to fill an interior basin formed by the current quays 14, 15 and 16 (surface area of +-17,000 m 2 ), to build a new quay 16 (length +-121 m) which will form a continuous line between the quay 19 and wharf 13 located further east, as well as to build the infrastructure required for the replacement and modernization of the alumina and grain handling equipment of the Alcoa and G3 companies operating in this sector of the port. The Project to be carried out includes the main works described below. Please note that this description is intended solely to provide a general overview of the scope of the work constituting the Project and covered by this Call for Tenders. The Call for Tender Documents and the plans and specifications specify in detail the various works to be carried out as well as the APTR's requirements for carrying out the Project. Without being limited to it, the work to be carried out as part of the Project is generally described as follows: Construction of a new quay front in steel sheet piles over a total length of +-365 m, including +-245 m in front of the existing quay 17 and +-120 m for closing the basin. This work includes in particular the concrete coping wall, the anchor ties, the retaining structures made up of steel sheet pile anchor walls (length +-95 m), retaining beams on piles (length +-127 m ) and prefabricated concrete anchor walls (length +-131 m), quay equipment (mooring bollards, fenders, ladders, mooring guards), the closure structure at the junction of the new quay 16 with the existing quay 13 and, if required depending on the phasing of the work, the temporary closure between phases 1 and 2 of the Project, the removal of underwater piles in front of the existing quay 17 and the removal of existing quay equipment affected by works (mooring guards, mooring bollards, fenders, ladders, etc.); All demolition work required for the construction of new structures (concrete and wooden structures, existing networks such as drainage, aqueduct, electrical, hydrocarbon, etc.); All excavation and backfilling work required including water control, management and disposal of contaminated materials, monitoring and control of settlement; All environmental monitoring and environmental protection measures; Backfilling work on the interior basin (formed by quays 16, 15 and 14) over an area of +-17,000 m2 ; Construction of the foundations for Alcoa and G3 handling equipment made up of concrete structures resting on a system of deep pile foundations. These works include in particular the linear foundations of Alcoa's PDPs (length +- 169 m), the foundations of three (3) fixed loading towers of G3, the foundations of the Alcoa and G3 handling galleries, and the foundations of the installations additional information required; Construction of new storm drainage and water supply networks for new developed areas; Extension of a storm outfall from the City of Trois-Rivieres through the filling of basin 16 (length +- 165 m); Construction of electrical infrastructure in the areas affected by the work, including lighting for Basin 16, underground distribution networks; Earthworks and paving of areas affected by the work (surface area +- 32,315 m 2 ); Modification and relocation work on underground industrial pipes for handling liquid bulk for the company Somavrac at quay 14.

Post-Bid

Water / Sewer

$82,300,000.00

Public - City

Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
176
Bidding Soon
3,046
All Active Projects
1,251
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 6, 2024

July 5, 2024

img_map_placeholder

132 Bd de la Commune, Trois-Rivieres, QC

Related To This Project